Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D06-0032
Review Name: REVISION - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/25/2007 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 07/02/2007 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
| 07/10/2007 | CDRC1 | PIMA COUNTY | WASTEWATER | Approv-Cond | July 10, 2007 To: Craig A. Hunt, P.E. Engineering and Environmental Consultants, Inc. Thru: Patricia Gehlen, CDRC Project Manager City of Tucson Development Services Department From: Chandubhai C. Patel, P.E., Civil Eng. Manager Development Review Division (Wastewater) Pima County Development Services Department Subject: First Magnus Bank Building Amended Development Plan - 1st Submittal D06-032 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. You are proposing, as part of this project, to connect the proposed sewer line into the 8-inch public sewer G-2004-027. This public sewer G-2004-027 is now being formally accepted for service by the PCWMD . The Pima County Department of Environmental Quality and the Wastewater Management Department hereby approve the above referenced submittal of the Development Plan received by us on June 25, 2007. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality Department. Also, air quality activity permits must be secured by the developer or prime contractor from Pima County Department of Environmental Quality before constructing, operating, or engaging in any activity which may cause or contribute to air pollution. If you have any question regarding the above comments, please do not hesitate to contact me. Sincerely, Chandubhai C. Patel, P.E 520-740-6563. Copy: Project file |
| 07/10/2007 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D06-0032 FIRST MAGNUS NATIONAL BANK/REVISED DEVELOPMENT PLAN DATE: July 10, 2007 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: 1.) Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. jg |
| 07/17/2007 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 WR#184080 July 17, 2007 Dear Mr.Hunt: SUBJECT: FIRST MAGNUS NATIONAL BANK - REVISION D06-0032 Tucson Electric Power Company has reviewed and approved the development plan submitted July 3, 2007 It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. The electrical design has been competed for this project, see attached drawing. Depending on the footers for the drive in teller bays, TEP my need to reroute the duct to the TEP transformer to the east side. The engineer and TEP can discuss this prior to construction to determine if the construction drawing needs to be revised. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Ms. Mary Boice New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8732 Please call the area Designer Nancy DiMaria at (520) 918-8267 should you have any questions. Sincerely, Henrietta Noriega Office Specialist Design/Build hn Enclosures cc: D. Elder, EEC N. DiMaria, TEP |
| 07/25/2007 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approv-Cond | July 25, 2007 ACTIVITY NUMBER: D06-0032 PROJECT NAME: First Magnus National Bank Office PROJECT ADDRESS: 1925 N Kolb Rd PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering recommends a Conditional-approval of the Development Plan. Address the following comments prior to mylar. 1. Call out all curb return radius. Along Kolb Road the access points shall have 25' radius curb returns. All other shall have a minimum 18' radius curb return.(DS 3-01.0 figure 6) 2. Illustrate the schematic striping required along Calle La Paz, and note that dimensions will be provided on the grading plan. If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov |
| 07/27/2007 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Denied | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D06-0032 First Magnus National Bank (Revised Dev.Plan) () Tentative Plat (X) Development Plan (X) Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other CROSS REFERENCE: C9-06-24 Alta Vista Communities - Kolb Rd. NEIGHBORHOOD PLAN: General Plan GATEWAY : Yes COMMENTS DUE BY: July 24, 2007 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP () Proposal Complies with Rezoning Conditions () RCP Proposal Complies With Plan Policies (X) See Additional Comments Attached () No Additional Comments - Complies With Planning Comments Submitted on: () Resubmittal Required: ( ) Tentative Plat (X) Development Plan (X) Landscape Plan ( ) Other REVIEWER: msp 791-4505 DATE: July 24, 2007 Department of Urban Planning & Design Comments D06-0032 - First Magnus National Bank July 24, 2007 Staff offers the following comments: 1. Compliance to rezoning case C9-06-24 requires a specific percentage of vegetation within detention basins (rezoning condition # 12) and requires additional landscape material to screen drive thru lanes(rezoning condition # 14). These rezoning conditions need to addressed in the development plan (revised) submittal. Development plan submitted does not include a landscape plan to address these landscape/rezoning requirements. |
| 07/30/2007 | WILLDAN | ENGINEERING | REVIEW | Passed | |
| 07/30/2007 | WILDAN | LANDSCAPE | REVIEW | Passed | |
| 07/30/2007 | WILDAN | ZONING | REVIEW | Passed | |
| 07/31/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES July 31, 2007 Craig Hunt Engineering and Environmental Consultants, Inc. 4625 East Ft. Lowell Road Tucson, Arizona 85712 Subject: D06-0032 First Magnus National Bank Office Building Development Plan Dear Craig: Your submittal of June 26, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 3 Copies Revised Development Plan (Traffic, DUPD, DSD) 2 Copies Revised Landscape Plan (DUPD, DSD) PLEASE NOTE THAT THE ENGINEERING, ZONING, AND LANDSCAPE REVIEWS ARE GOING THIRD PARTY REVIEW (WILDAN). THE ABOVE RESUBMITTAL REQUIREMENTS DO NOT INCLUDE ITEMS NEEDED FOR THOSE REVIEWS. Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 321-0333 dp-resubmittal |
| 07/31/2007 | ANDY VERA | ENV SVCS | REVIEW | Approved |