Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: D06-0030
Parcel: 136150320

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0030
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/24/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
10/30/2006 JASON GREEN ENGINEERING REVIEW Approved DATE: October 30, 2006
SUBJECT: Development Plan for TEP Pantano Substation- 2nd Engineering review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 7960 E Lakeside PW, T14S R15E Sec28, Ward 2
REVIEWERS: Jason Green, CFM
ACTIVITY: D06-0030


SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed development plan and the submitted drainage report. The drainage report was reviewed for development plan purposes only. The development plan is conditionally approved with the following conditions:


1) Documentation from COT Sanitation Division of Environmental Services is required for the elimination of the refuse containers and maneuverability requirement prior to Mylar approval.


GRADING PLAN:

2) DS Sec.11-01.2.1: A grading permit will be required for this project due to the cut and fill quantities provided on the development plan. Fill quantities shown exceed the 50 cubic yards so a grading plan and a grading permit application will be required after development plan approval and prior to any construction activity.

3) Please ensure that any future grading plan will be consistent with the development plan and drainage report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf

4) Arizona Pollutant Discharge Elimination System (AZPDES) requirements are applicable to this project. Stormwater Pollution Prevention Plans (SWPPP) and text addressing stormwater controls for all areas affected by construction activities related to this development will be required with a grading plan submittal. For further information, visit www.adeq.state.az.us/environ/water/permits/stormwater.html.


GENERAL COMMENTS:

Please provide the letter from COT Sanitation Division of Environmental Services documenting that refuse containers are not required for this project. The letter is required prior to Mylar approval.


For any questions call me at 791-5550, extension 1189.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
10/31/2006 JOSE ORTIZ COT NON-DSD TRAFFIC Approv-Cond Provide a 30' (and not a 20') curb opening at the south entrance along Pantano Road to ensure that larger service vehicles can get on-site with minimal disturbance to northbound through traffic on Pantano.

If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov
11/08/2006 KAROL ARAGONEZ ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0030
Pantano Substation
Development Plan Resubmittal

TRANSMITTAL DATE: November 8, 2006

DUE DATE: November 22, 2006

COMMENTS:

The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.

1. Recorded lot combo must accompany mylars for sign-off.

2. Please add to development designator "30" matrix proposed FAR (0), building height (0), and proposed setback of equipment from street frontages.
LUC 3.2.3.2.B & LUC 3.2.6.4


If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 1197.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0030dpr.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan and additional requested documents.
11/15/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approved November 15, 2006

TO: Robin Valenzuela
The Planning Center

THRU: Patricia Gehlen
City of Tucson, Development Services Department

FROM: Chandubhai Patel, P.E.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: TEP Pantano Substation
Development Plan – 2nd Submittal
D06-030


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


The Pima County Department of Environmental Quality and the Wastewater Management Department hereby approve the above referenced submittal of the Development Plan as received by us on October 24, 2006.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval to Construct) may need to be obtained from the Pima County Environmental Quality Department.

Also, air quality activity permits must be secured by the developer or prime contractor from Pima County Department of Environmental Quality before constructing, operating, or engaging in an activity which may cause or contribute to air pollution.

If you have any questions regarding the above comments, please do not hesitate to contact me.

Sincerely,


Chandubhai Patel, P.E.
Telephone: (520) 740-6563

Copy: Project File
11/15/2006 JOE LINVILLE LANDSCAPE REVIEW Approved
11/21/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

November 21, 2006

Robin Valenzuela
The Planning Center
110 South Church Avenue, Sutie 6320
Tucson, Arizona 85701

Subject: D06-0030 Pantano Substation Development Plan

Dear Robin:

The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per on-line comments, please submit the following documents for sign-off.

1 Double Matte right-reading Océ or Photo Mylar of the COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal).
AND
1 Double Matte right-reading Océ or Photo Mylar of the Development Plan.

The extra Double Matte right-reading Océ or Photo Mylar that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete mylar set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the mylar and two (2) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options.

Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 622-1950
dpapproved