Permit Number: D06-0016
Parcel: 133170670

Address:
350 N WILMOT RD

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0016
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/13/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
11/30/2006 KAROL ARAGONEZ ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0016
St. Joseph's Hospital Phase II
Development Plan Resubmittal

TRANSMITTAL DATE: November 30, 2006

DUE DATE: December 12, 2006

COMMENTS:

The Zoning Review Section approves the development plan for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.




If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 1197.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0016dpr1.doc
12/05/2006 JOE LINVILLE LANDSCAPE REVIEW Approved
12/07/2006 LAITH ALSHAMI ENGINEERING REVIEW Approved Laith Alshami, Engineering and Floodplain Review, 12/07/2006

TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: St. Joseph's Hospital Phase II
D06-0016, T14S, R15E, SECTION 07

RECEIVED: Development Plan, Landscape Plan and Drainage Report on November 13, 2006

The subject project has been reviewed. The Drainage Report is acceptable for Development Plan review purposes and it is hereby approved. Additional drainage information might be required with the Grading Plan.

The Development Plan is acceptable and it is recommended for approval pertaining to Engineering and Floodplain Review.

The Landscape Plan is acceptable, however, ensure that the proposed landscaping does not obstruct the proposed detention basin inlets, outlets and maintenance access ramps. Such obstructions will be checked in the field during construction and might delay the acceptance of the project.
12/22/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approved December 22, 2006

TO: Steven Gregor, P.E.
Gregor Engineering, Inc.

THRU: Patricia Gehlen
City of Tucson, Development Services Department

FROM: R S Engineering (Contract Reviewer)
Chandubhai Patel, P.E.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: St. Joseph’s Hospital Medical Office Building and Southwest Parking Garage
Development Plan – 3rd Submittal
D06-0016


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


The comments of the letter of September 5, 2006 have been satisfied; therefore this project is approved as submitted.

Pima County Department of Environmental Quality and Department of Wastewater Management hereby approve the above referenced submittal of the development plan.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval to Construct) may need to be obtained from the Pima County Department of Environmental Quality.

Also, air quality active permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in an activity which may cause or contribute to air pollution.



If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Michael J. Harrington, Sr. CEA
Telephone: (520) 740-6579

Copy: RSE Job # 0432.06.8
12/27/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approved COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

December 27, 2006

Steve Gregor
Gregor Engineering, Inc.
5232 East Pima Street, Suite A
Tucson, Arizona 85712

Subject: D06-0016 St. Joseph's Hospital Phase II Development Plan

Dear Steve:

The above referenced development plan has been APPROVED by the Community Design Review Committee. Please submit the following documents for sign-off.

1 Double Matte right-reading Océ or Photo Mylar of the COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal).
AND
1 Double Matte right-reading Océ or Photo Mylar of the Development Plan.

The extra Double Matte right-reading Océ or Photo Mylar that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete mylar set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the mylar and two (2) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options.

Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 319-1181
dpapproved