Permit Number: D06-0010
Parcel: 12607069A

Address:
60 N ALVERNON WY

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D06-0010
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/31/2006 MARILYN KALTHOFF START PLANS SUBMITTED Completed
09/08/2006 KAROL ARAGONEZ ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: D06-0010
Realty Executives Office Bldg.
Development Plan

TRANSMITTAL DATE: September 8, 2006

DUE DATE: September 29, 2006

COMMENTS:

1. Previous note: Prior to approval of the development plan a lot split application must be processed and approved. A separate application, fees, review, and approval by DSD is required for the lot split. Please call David Rivera if you have any questions related to the lot split process. If the lot split has been processed and approved by DSD, submit copies of the approved survey drawing along with the recorded legal descriptions (with docket and page stamped) with the next submittal.
DS 2-05.2.4.A

2. Previous note: Submit copies of the recorded document providing for cross access, parking, and pedestrian circulation.


If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550.

KAA S:\zoning review\karol\planning\cdrc\developmentplan\D06-0010dpr2.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Lot split approval and recorded cross access agreement.
09/11/2006 PATRICIA GILBERT ENGINEERING REVIEW Denied TO: Patricia Gehlen; CDRC Coordinator DATE: September 11, 2006

SUBJECT: Engineering review of the Office Building for Realty Executives Development Plan. The activity number is D06-0010.

SUMMARY: The Development Plan and Drainage Report were received by Engineering on August 31st, 2006. This office does not recommend approval of the development plan.

SUBMITTAL REQUIRED: MYLAR DEVELOPMENT PLAN

RESUBMITTAL: DEVELOPMENT PLAN

This project is required to have a grading review and grading permit.

1. Provide in a general note the City of Tucson Datum.

2. Include on the development plan in a general note estimated cut and fill quantities. DS 2-02.2.1.A.17.
09/19/2006 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond Clarify keynote 27 on sheet DP-1. It currently reads that the utility easement is 10' X 130'.
09/25/2006 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: D06-0010 REALTY EXECUTIVES OFFICE BLDG/REVISED DEVELOPMENT PLAN
DATE: 9/21/06



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.

Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses.

2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection.


ES
09/28/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond September 28, 2006

TO: David Johns
Omni Architecture, Inc.

THRU: Patricia Gehlen, CDRC Manager
City of Tucson, Development Services Department

FROM: R S Engineering (Contract Reviewer)
Chandubhai Patel, P.E.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: Office Building for Realty Executives
Development Plan – 3rd Submittal , D06-0010


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


Sheet DP-1. A cleanout is required at the point of deflection or change of flow direction just downstream of C.O. # 1. Show the rim and invert elevations for this C.O.

Sheet DP-1 A clean out is required between the proposed C.O.# 1 and #2 as this reach is longer than 100 feet. Show the rim and invert elevations for this C.O.

SUBJECT TO THE ABOVE CONDITIONS, the Pima County Department of Environmental Quality and the Wastewater Management Department hereby approve the above referenced submittal of the Development Plan as received by us on August 28, 2006. The revisions may be shown on the Mylars.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval to Construct) may need to be obtained from the Pima County Department of Environmental Quality.

Also, air quality active permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in an activity which may cause or contribute to air pollution.



If you have any question regarding the above comments, please do not hesitate to contact me.

Sincerely,



Chandubhai Patel, P.E.
Telephone: (520) 740-6563

Copy: Project file
09/29/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

September 29, 2006

David Johns
Omni Architecture Inc.,
2910 North Swan Road, Suite 105
Tucson, Arizona 85712

Subject: D06-0010 Realty Executives Office Building Development Plan

Dear David:

Your submittal of August 31, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval of the Development Plan is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter for each agency explaining how each outstanding requirement has been addressed.

ALL BLUELINES MUST BE FOLDED

4 Copies Revised Development Plan (Wastewater, Engineering, Zoning, DSD)









Should you have any questions, please call me at 791-5608, ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/