Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D06-0009
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/06/2009 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
03/09/2009 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
03/10/2009 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | March 10, 2009 D06-0009 Revised Development Plan The Engineering Division doesn't recommend approval of this revision of the Development Plan. The following issue must be addressed: 1. Revise the crosswalk configuration to avoid having a crosswalk intersection within the PAAL intersection. If you have any questions, please contact me at loren.makus@tucsonaz.gov. Loren Makus, EIT Senior Engineering Associate |
03/10/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Approved | Sheet DP11: 1. Relocate the detectable warning strip at the two accessible parking spaces from the ramp to the end of the parking ailse just prior to entering the PAAL area. Sheet DP14: 2. At the North/South running marked crossing located at the entance to the South parking area, provide a note 6 reference to both ends of the marked crossing. 3. "T" marked crossing does not work, must connect corner to corner. END OF REVIEW |
03/10/2009 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
03/13/2009 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 WR# 158916 March 13, 2009 Stanley Consultants Inc. Attn: Richard Norton P.E. 1661 E Campbell Road Phoenix, Arizona 85016 Dear Mr. Norton : SUBJECT: Tucson Spectrum Re Submittal D06-0009 Tucson Electric Power Company has reviewed and approved the development plan submitted March 09, 2009. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Ms. Mary Boice New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8732 Should you have any technical questions, please call the area Designer Mike Kaiser at (520) 918-8244. Sincerely, Elizabeth Miranda Office Support Specialist Design/Build lm Enclosures cc: DSD_CDRC@tucsonaz.gov, City of Tucson (email) M. Kaiser, Tucson Electric Power |
03/17/2009 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
03/19/2009 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Denied | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D06-0009 Tucson Spectrum:Revision 3/19/09 () Tentative Plat (x) Development Plan (x) Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other CROSS REFERENCE: C9-05-23 - Harkins Theaters - Calle Santa Cruz NEIGHBORHOOD PLAN: Santa Cruz Area Plan GATEWAY/SCENIC ROUTE: NO COMMENTS DUE BY: March 20, 2009 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: (X) Resubmittal Required: 1. Please provide required documentation, such as but not limited to; color drawings, building elevations, and a color palette of the existing buildings/colors in Phase 1 and the proposed buildings/colors in Phase II, to verify compliance with rezoning condition # 16 and # 18, which read respectfully: Rezoning Condition # 16 - Building elevations visible from Interstate-19 and Calle Santa Cruz shall be designed with architectural character and detail comparable to the main entrance of the existing buildings in Phase I. Consistent design treatments, including but not limited to, comparable color palette, signs, rooflines and trim materials shall be provided. Phase II shall be comparable in color theme and design elements, as used in Phase 1. Rezoning Condition # 18 - Phase II shall be architecturally compatible relating to design and color palette with Phase 1 of the Tucson Spectrum Power Center. 2. Please verify the Department of Development Services, Sign Section, is reviewing a sign program designed with common elements and a common range of colors for Phase II. Sign program to include the perimeter pylon signs, if applicable, as required by rezoning condition # 28, which reads as following: A sign program shall be designed with common elements and a common range of colors for Phase II. Sign program to include the perimeter pylon signs, if applicable |
03/19/2009 | FERNE RODRIGUEZ | PIMA COUNTY | WASTEWATER | Approved | March 18, 2009 To: Brent Steffenhagen Stantec Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ___________________________ From: Tom Porter, Sr. CEA (520-740-6719), representing the Pima County Departments of Wastewater Management and Environment Quality Subject: Tucson Spectrum Ph. 2 - Calle Santa Cruz & Drexel Rd. Dp REV 2 –1st Submittal D06-009 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above-mentioned comments, please contact me. |
03/23/2009 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: D06-0009 Tucson Spectrum - Pad 5 Revised Development Plan TRANSMITTAL DATE: March 23, 2009 DUE DATE: March 20, 2009 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is March 19 2010. 2. The following items must be revised or addressed. a. Revise the location of the truncated domes for the ramp along the north side of the parking north of the building (Parking area adjacent to the fenced in area). Also it is not clear if the ramp is needed due to a grade change or just placed in the wrong location. The truncated domes as called out would definitely be placed in the wrong location based on the key note for this ramp. b. Annotate the loading zone with a keynote. Also please ensure that it is clearly marked. c. The crosswalk at the southwest area of the revision area is incorrect. The crosswalk must lead the pedestrian to a access ramp at the either curb returns. d. All parking spaces that abut a sidewalk must be provided with wheel stops or the sidewalks must be constructed to a width of six and on-half feet. Draw the wheel stops or for all parking spaces that abut sidewalks and dimension the side walks or use key notes to annotate. e. Please ensure that any changes made to the base plan are made to the corresponding sheets, landscape utilities etc. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\planning\cdrc\developmentplan\D060009dp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan. |
03/25/2009 | ANDY VERA | ENV SVCS | REVIEW | Denied | 1. Sheet 14 - Vertical curb runs along PAAL in front of parking spaces south of pad 5. In addition, the vertical curb island at the east end of these parking spaces shows two different radius designs. Please clarify. Solid Waste collection vehicle will require the greater radius design shown to allow for adequate maneuverability. 2. Provide one additional single enclosure next to the existing to accomodate for both refuse and recycle waste materials/dumpsters. Business type will generate both waste types...previous pad 5 design accomodated for both. Please provide corrections on resubmittal. If you have any questions you may contact Andy Vera at (520) 791-5543 ext 1212 or e-mail: Andy.Vera@tucsonaz.gov |
04/06/2009 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES April 6, 2009 Mike C. Perez Architectural Resource Team, Inc. 99 East Virginia Avenue, Suite 120 Phoenix, Arizona 85004 Subject: D06-0009 Tucson Spectrum Revised Development Plan Dear Mike: Your submittal of March 9, 2009 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a 7 sets of the DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 7 Copies Revised Development Plan (ADA, Engineering, DUPD, Zoning, ESD, Addressing, DSD) 4 Copies Revised Landscape Plan (Engineering, DUPD, Zoning, DSD) 2 Copies Dimensioned, color building elevations (DUPD, DSD) Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: ???? dp-resubmittal |
04/06/2009 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 JENNIFER STEPHENS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: JENNIFER STEPHENS, ADDRESSING OFFICIAL SUBJECT: D06-0009 TUCSON SPECTRUM/DEVELOPMENT PLAN DATE: 4/02/09 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: Label North Arrow on Location Map. Correct legal description to Tucson Spectrum Bk 63 Pg 54 on all sheets. (Plans list name as “Parque de Santa Cruz” which is incorrect.) Correct Interstate I-19 to Interstate 19 on all applicable sheets. |