Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEVELOPMENT PLAN
Permit Number - D05-0047
Review Name: DEVELOPMENT PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/03/2006 | JCLARK3 | ENV SVCS | REVIEW | Approved | * No known landfill within 1000 feet of this development. * Access OK for rolloff compactor service. * A 14' x 40' clear area is required for service in front of the compactor area. |
01/10/2006 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Denied | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D05-0047 Office Depot (El Con PAD 1) 01/10/06 ( ) Tentative Plat () Development Plan () Landscape Plan ( ) Revised Plan/Plat ( ) Board of Adjustment () Other (Color Elevation) CROSS REFERENCE: C9-56-01, C9-74-34, C9-88-12 NEIGHBORHOOD PLAN: Alvernon-Broadway Area Plan GATEWAY/SCENIC ROUTE: Broadway (Gateway) COMMENTS DUE BY: January 25, 2006 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: ( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment ( ) Proposal Complies with Annexation or Rezoning Conditions ( ) RCP Proposal Complies With Plan Policies ( ) See Additional Comments Attached ( ) No Additional Comments - Complies With Planning Comments Submitted on: () Resubmittal Required: ( ) Tentative Plat () Development Plan ( ) Landscape Plan () Other (Certification Letter of Arch. Design) REVIEWER: K. Aragonez 791-4505 DATE: January 9, 2006 Please clearly indicate the outline of the proposed off-street loading space on the development plan to assure there are no conflicts with the compactor. Please indicate on the development plan the screening material and height that surrounds the refuse container. Please provide a letter from the Architects for El Con certifying the elevations are in compliance with the development agreement condition VII.a. Please add reference to Development agreement condition III.a concerning bus stops. Bus stops developed on Broadway must be designed with ADA compliant shelters and canopy trees. The specific design of the shelters shall be compatible with the overall architectural theme of El Con and shall include original artwork. An elevation of the bus stop is to be provided to this department for review along with a certification letter from the El Con architects certifying it’s design is compatible to rest of the Mall. |
01/18/2006 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) Add the CDRC case number and any related case numbers to the landscape and native plant preservation plans. DS 2-07.2.1.B 2) Landscape borders proposed in right-of-way areas must be approved by the City Engineer or designee and comply with the City Engineer's requirements on construction, irrigation, location, and plant type. Provide verification, in writing, of any approvals obtained from the City Engineer. Contact Gary Wittwer, TDOT Landscape Architect for specific requirements. 3) Clarify which individual trees and plants are proposed to be removed from the MS&R right-of-way on the landscape plan. Include approval of this work in the correspondence with the City Engineer requested in comment 3. 4) Portions of the street landscape border include a screen wall located five feet from the street property line. The Land Use Code allows walls within street landscape borders only in specific situations. The walls should not extend into the landscape border more than the width of the wall, except as provided in LUC 3.7.3.2.C.3 5) A 6' high masonry screen wall is required for the refuse storage area. Revise the landscape and development plans to show the screen walls, describe materials, and note the required minimum height. RESUBMITTAL OF ALL PLANS IS REQUIRED. No submittal for Native Plant Preservation is required. |
01/26/2006 | JOSE ORTIZ | ENGINEERING | REVIEW | Denied | January 26, 2006 ACTIVITY NUMBER: D05-0047 PROJECT NAME: Office Depot El Con Pad 1 PROJECT ADDRESS: El Con Mall PROJECT REVIEWER: Jose E. Ortiz, Civil Engineer Resubmittal Required: Development Plan, and Drainage Report The following items must be revised or added to the plan. Many of the following comments may not apply with a submittal of a revised Master Drainage Report, which will address the drainage issues, involved with Pad 1. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. A legend, which shows and describes all symbols used on the drawing, is to be placed on the plan, preferably on the first sheet. DS 2-05.2.1.J Currently no information provided in legend. 3. List the following note on all development plans: "No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Development Standard 3-01.0." DS 2-05.2.2.D.2 4. Verify that all easements are being drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement is to occur prior to issuance of permits. DS 2-05.2.3.B 5. Indicate the ground elevation on the site based on City of Tucson Datum (indicate City of Tucson field book number and page). DS 2-05.2.3.E 6. If the project is to be phased, provide calculations, setbacks, etc., to indicate that each phase complies with all requirements as a separate entity. Show and label any temporary improvements that may be needed to make the site function for each phase as one entity. If such temporary improvements are off the site of the phase under consideration, a temporary easement or other legal documentation to assure legal use of the property is required. Note recording information. DS 2-05.2.4.C 7. If the project is phased, the phase under consideration shall be designed so that later phases are assured legal access. If such access is provided through the phase under consideration, public streets are required, or access easements must be delineated and dedicated for such use. If private easements are utilized, protective covenants establishing the right of access and incorporation of future phases into this project are required. DS 2-05.2.4.D.4 8. If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Callout the MS&R future sidewalk, right-of-way lines, etc.) DS 2-05.2.4.F 9. If applicable, all proposed easements (utility, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. DS 2-05.2.4.G 10. In conjunction with a drainage report or statement, as applicable, prepared in accordance with the City Engineer's instructions and procedures, the following information will be indicated on the development plan. For additional information regarding drainage standards, see the City of Tucson Standards Manual for Drainage Design and Floodplain Management. DS 2-05.2.4.H 11. Show areas of detention/retention with water surface elevations. DS 2-05.2.4.H.1 12. Ensure that no nuisance ponding takes place on-site or off-site due to this development by indicating all proposed drainage solutions, such as origin, direction, and destination of flow and method of collecting and containing flow. DS 2-05.2.4.H.2 13. Provide locations and types of drainage structures, such as, but not limited to, drainage crossings and pipe culverts. DS 2-05.2.4.H.3 14. Indicate all proposed ground elevations at different points on each lot to provide reference to future grading and site drainage. DS 2-05.2.4.H.4 15. Verification will be provided that any drainage solutions, which occur outside the boundaries of the development plan area, are constructed with adjacent owners' permission. (Additional notarized documentation of that approval will be submitted with the drainage report.) DS 2-05.2.4.H.5 16. Draw locations and indicate types of off-site runoff acceptance points and/or on-site runoff discharge points. DS 2-05.2.4.H.7 17. All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. On zoning setbacks, if the building is proposed for location at a greater distance from the property line than the required setback, show only the dimension of the distance between the building and the property line. If the setback's point of measurement is not the property line, include the distance from the property line to the point of measurement. DS 2-05.2.4.I 18. Show sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section. DS 2-05.2.4.R 19. The specific maintenance notes specified in the Standard Manual for Drainage Design and Floodplain Management, SMDDFM.14.3 must be included on the Development Plan. A. The responsibility of operating and maintaining a local detention basin rests with the owner of the facility. However, the City of Tucson reserves the right to periodically inspect of review any private-maintenance actions that would help to ensure that private maintenance, related to facility operation and safety, is being adequately provided. B. The Covenants, Conditions and Restriction (CC&Rs), Final Plats or Development Plans shall have a note stating (a) that the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures and detention basins; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and detention/retention facilities at least once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and detention/retention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or owners agree to reimburse the City for any and all costs associated with maintaining the drainage and detention/retention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities. C. The certified annual inspection report shall contain the following summaries: (a) either a statement that no maintenance work is needed at that time, or a list of repairs and work to be done to correct deficiencies or potential problems and/or to restore the aesthetics, followed by a letter of certification from an Arizona Registered Professional Civil Engineer stating that the recommended work has been satisfactorily completed; and (b) a statement either indicating that watershed conditions have not changed since the previous inspection report, or stating that specific changes have occurred which alter or eliminate some of design features and affect the level of service of the drainage and detention/retention systems. The City Engineer is to be notified if watershed conditions have changed to the extent that drainage and detention/retention systems no longer satisfy the requirements of the Floodplain Regulations found in the Tucson Zoning Code. 20. Small, local detention basins constructed in compliance with Section 23-469 of the Tucson Zoning Code will not be accepted by the City of Tucson for maintenance or liability. All local detention/retention basins shall be constructed according to current design standards, and they must include appropriate access and maintenance easements, including an unobstructed access route into the basin. SMDDFM 1.5.2 21. As part of the drainage report submitted in conjunction with the Development Plan, a detailed inspection list and basin-performance criteria shall be included for subsequent reference by the Engineer responsible for annual and as-needed maintenance inspections of the basins and drainageways. SMDDFM 1.5.2 22. A Grading Plan and Permit will be required. 23. Proposed developments exceeding 1 acre of disturbance are subject to NPDES requirements. Contact Patricia Gilbert @ 791-5550 for submittal requirements. The NPDES submittal must accompany the Grading Plan submittal. 24. As per Federal ADA requirements, all wheel chair ramps shall have the Truncated Domes instead of the standard grooves, which are shown on City of Tucson Standard Detail 207. Aside from the Truncated Domes, the wheel chair ramps shall be constructed in accordance with the Standard Detail 207. 25. Callout, with dimensions, sidewalks along the west truck route. 26. Additional callouts of radii's of all curb returns and curves along curb line are needed. For example the curb line along the loading dock. If you have any questions, I can be reached at 791-5640 x1191 or Jose.Ortiz@tucsonaz.gov |
01/31/2006 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: OFFICE DEPOT D05-0047 Tucson Electric Power Company has reviewed and approved the development plan submitted for review December 23, 2005. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Mike Kaiser Design/Build - DB 102 Tucson Electric Power Company P. O. Box 711 Tucson, AZ 85702 Please call me at (520) 917-8745, should you have any questions. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com |
02/02/2006 | DALE KELCH | COT NON-DSD | TRAFFIC | Denied | Traffic Engineering REJECTS this DP: 1. Show and label as to size (ie 20x110) both existing and future SVTs (DS 2-05.2.4.R) If the existing and future SVTs are coincident, label it as both existing and future. 2. List the name, ROW width, recordation data, type and dimensioned with of paving, curbs, curb cuts and sidewalks. (DS 2-05.2.2.D). There is no recordation data provided for Broadway 3. The access points shall have 25' radius curb returns. (DS 3-01.0 figure 6). Label the radius dimension. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
02/06/2006 | TIM ROWE | PIMA COUNTY | WASTEWATER | Denied | February 5, 2006 TO: Pattie Davis MMLA Psomas THRU: Patricia Gehlen City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: El Con – Office Depot Development Plan – 1st Submittal D05-047 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. Provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. A capacity request form may be found at http://www.pima.gov/wwm/forms/docs/CapResponseRequest.pdf. ALL SHEETS. Add the project number, D05-0047, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers. Based on the evaluation of the proposed sewer design, this project qualifies for Standard sewer connection fee rates. SHEET SP 1.3. Show the proposed private sewer all the way to its point of connection with the existing public sewer. At the point of connection, show the size and Pima County plan number of the existing public sewer. If connection to an existing public sewer manhole, also show the manhole six-digit number, rim elevation and invert elevation. We will require a revised set of drawings and a response letter addressing each comment. Additional comments may be made during the review of these documents. The next submittal of this project will be the 2nd submittal. A check for the review fee of this submittal in the amount of $50.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter. For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
02/13/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: D05-0047 El Con Mall Pad 1- Office Max Development Plan TRANSMITTAL DATE: February 9, 2006 DUE DATE: January 25, 2006 COMMENTS: 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is December 22, 2006. The location of the proposed Office Max building encroaches onto the R-2 zone parcel. No development other than parking spaces, landscaping, or PAALs may occur within the residentially zoned area. This plan has been reviewed by the Zoning review section as a courtesy and in no way implies that the proposed location is acceptable. Additional comments may be forthcoming based on the redesign of the building location. 2. If the project is located within the boundaries of a Planned Area Development (PAD) zone, such as Williams Addition, Gateway Center, Tucson Community Center, Rio Nuevo, La Entrada, or Civano, include a reduced-scale map of the PAD District on the first sheet, indicating the location of the portion being developed. A separate sheet depicting the entire shopping center with the proposed development site highlighted or clouded should be included in the development plan package. The sheet that should to be included is labeled as SP1.0 dated 2-11-02 with the CDRC stamped of approval. 3. Include in the title block the Pad number and name of the proposed development. Also include a brief legal description based on the section, township, and range unless this is a resubdivision of a previously platted parcel. DS 2-05.2.1.G.1 and .2 4. A legend, which shows and describes all symbols used on the drawing, is to be placed on the plan, preferably on the first sheet. DS 2-05.2.1.J 5. This project has been assigned the development plan case number D05-0047. Please list the case number in the lower right corner of plan sheets. DS 2-05.2.2.B.2 6. Revise general note 8 as follows. This site has been designed to meet the criteria of both the Gateway Route LUC section 2.8.4 and the Major Streets and Routes (MS&R) Setback Zone LUC section 2.8.3. DS 2-05.2.2.10 7. If applicable, draw, label, and dimension existing or proposed easements within the Pad area. DS 2-05.2.3.B and DS 2-05.2.4.G 8. Draw and dimension the future curb location to the future property line. Clarify if the existing curb location is also considered the future curb location. Also please dimension the existing curb to property line. Although it is acknowledged that the building setback for the proposed structure has been met, please add a dimension from the back of the existing curb and future back of curb if different than the existing curb location. DS 2-05.2.3.C 9. Please review online zoning maps and revise the zoning classifications on the development plan appropriately. DS 2-05.2.4.B 10. Please dimension the width of the PAAL area along the north side of the pad. DS 2-05.2.4.D.3 11. If applicable, Show all right-of-way dedications on or abutting the site and label. If the development plan has been prepared in conjunction with a subdivision plat or is required as a condition of approval of a review process, such as a rezoning, street dedications in accordance with the Major Streets and Routes (MS&R) Plan may be required by these processes. DS 2-05.2.4.E If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw and dimension the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, etc.) DS 2-05.2.4.F 12. Please revise the section of the pedestrian circulation as follows: Along the east side of the building a crosswalk has been proposed which must be revised to a raised concrete sidewalk with a minimum of four feet in width unless a greater width is required by the Pad document. The crosswalk as depicted is unsafe and does not meet the DS 2-08. The crosswalk can be revised to provide a concrete sidewalk with an access ramp and the access to loading dock can still be accessible. The sidewalk should extend as far north to a point where the access ramps would meet and a painted crosswalk can be provided to continue the circulation. Please revise as required. Also all access ramps shall be constructed with truncated domes. Please add a keynote for the truncated domes. DS 2-05.2.4.K 13. On the drawing, show the locations and footprints of all structures. Label the heights and building dimensions. DS 2-05.2.4.N 14. Dimension the loading dock area and specifically the loading space. The space must be a minimum of 12 feet wide by 35 feet long. Demonstrate maneuverability in and out of the loading space. DS 2-05.2.4.O 15. Please review the "Parking Tabulations (Actual)" for completeness. It does not appear that the correct information has been added midway through section of the tabulations text block. Please revise as required. DS 2-05.2.4.P 16. Please ensure that the bicycle parking is revised as well if applicable, due to the change in the vehicle parking calculations. Show, on the drawing, off-street bicycle parking locations, including materials for lighting and paving, type of security, dimensions, specific type of rack and the number of bicycles it supports, and the location and type of directional signage. When adjacent to pedestrian paths, indicate the width of clearance available for the pedestrian area. For specifics, refer to Development Standard 2-09.0. Provide, as a note, calculations on the number of bicycle spaces required and the number provided. Please keep in mind that both class one and class two spaces are required. DS 2-05.2.4.Q 17. Draw, label, and dimension the sight visibility triangles at the entrance to the development. DS 2-05.2.4.R 18. If applicable, please draw and label the refuse container and enclosure. See engineering comments for related information. DS 2-05.2.4.T 19. Indicate by separate response letter how applicable rezoning conditions affecting this pad have been addressed. DS 2-05.2.4.U 20. Indicate location and type of postal service to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping. DS 2-05.2.4.V 21. Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. For submittal with a development plan, a conceptual landscape plan showing typicals of proposed planting areas is sufficient. A detailed landscape plan is required at the time of application for permits. For more specific information, refer to Development Standard 2-07.0. See the landscape reviewer comments for more information. DS 2-05.2.4.X 22. As indicated in comment two, this plan has been reviewed as a courtesy. The fact that a portion of the building is proposed for construction in the R-2 zoned parcel is in violation. This plan will have to be redesigned or rezoning of the R-2 parcel would be required prior to any building construction on the R-2 parcel. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\planning\cdrc\developmentplan\D050047dp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, and additional requested documents. |
02/16/2006 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES February 16, 2006 Pattie Davis MMLA Psomas 800 East Wetmore Road, Suite 110 Tucson, Arizona 85719 Subject: D05-0047 Office Depot (El Con PAD 1) Development Plan Dear Pattie: Your submittal of December 23, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter for each agency explaining how each outstanding requirement has been addressed: ALL BLUELINES MUST BE FOLDED 8 Copies Revised Development Plan (Addressing, Community Planning, Landscape, Traffic, Zoning, Engineering, Wastewater, DSD) 5 Copies Revised Landscape Plans (Community Planning, Zoning, Landscape, Engineering, DSD) 2 Copies Revised Drainage Report (Engineering, DSD) Should you have any questions, please call me at 791-5608, ext. 1179. Sincerely, Patricia Y. Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 292-1290 |
12/23/2005 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
12/27/2005 | JIM EGAN | COT NON-DSD | FIRE | Approved | The Development Plan is approved December 27, 2005. |
12/28/2005 | KAY MARKS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D05-0047 OFFICE3 DEPOT (EL CON PAT 1) / DEVELOPMENT PLAN DATE: December 28, 2005 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: 1: Delete address for Pad 1 on sheet 1. The address for this project has not been assigned yet. |