Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D05-0041
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/03/2006 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 05/10/2006 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approved | May 9, 2006 TO: Chuck Schuiteman, AIA Sayler-Brown Bolduc Lara Architects LLC THRU: Patricia Gehlen City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: AGM Manufacturing Facility Development Plan – 2nd Submittal D05-041 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. This project is hereby approved as submitted. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
| 05/12/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Center Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: David Rivera Principal Planner PROJECT: D05-041 AGM Manufacturing Facility 2nd Review TRANSMITTAL: May 12, 2006 DUE DATE: May 17, 2006 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The five foot wide pedestrian refuge area (keynote 19) located adjacent to the phase 2 building must include a 4-foot sidewalk for pedestrian access which is setback 1 foot from the PAAL. The required sidewalk must be physically separated from the PAAL by means of curbing, grade separation, barriers, railings or other means. (D.S. 3-05.2.2.B.1) (DS 2-08.4.1) If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
| 05/15/2006 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) Revise the development plan and the landscape plan to correctly identify the MS&R right-of-way line for Fort Lowell Road and to only include permitted uses within the overlay zone per LUC 2.8.3.2, LUC 2.8.3.5. The MS&R is identified as 100' on the map dated 8/30/05. The landscape border is measured from the MS&R right-of-way line. 2) Revise the landscape plan to include slope ratios for all retention/detention basins. Basin slopes are required to have slopes no steeper than 4:1 where depths exceed three feet, 3:1 for unprotected slopes and 2: 1 for protected slopes for depths less than three feet. DS 10-01.4 Retaining walls are acceptable for up to 35% of the basin perimeter. 3) The retention basin(s) is to include a minimum of 20 trees per acre and should include two shrubs for every tree. The minimum groundcover requirement for the basin is 35%. Revise as necessary. DS 10.01.IV 4) Screening per LUC Table 3.7.2-I is required along Fort Lowell Road. The screening is to be located behind or at the development side of the street landscape border. LUC 3.7.3.2.C 5) The street landscape border along Palo Verde Ave. is required to be a minimum of ten feet wide and may not include the parking lot. LUC 3.7.2.4. Revise the plans as necessary. 6) Revise the landscape plan to include a legend for any keynotes used. DS 2-07.2.2 7) The landscape plan shows 2 property lines along Fort Lowell and Palo Verde. Revise as necessary. DS 2-07.2.1.A 8) Include calculations for vehicular use area trees on the landscape plans. DS 2-07.2.2.A.2.c 9) Revise the landscape and development plans to include consistent information regarding screen walls (see landscape plan call-out along Palo Verde). The development plan and the landscape calculations indicate a 5' high wall. RESUBMITTAL OF ALL PLANS IS REQUIRED. |
| 05/22/2006 | JOSE ORTIZ | ENGINEERING | REVIEW | Denied | May 22, 2006 ACTIVITY NUMBER: D05-041 PROJECT NAME: AGM Container PROJECT ADDRESS: 3526 E Fort Lowell Rd. PROJECT REVIEWER: Jose E. Ortiz, Civil Engineer Resubmittal Required: Development Plan The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. Provide a cross section/typical section across the proposed concrete lined detention/retention basin. 3. If the depth of water at the 100-year event in the proposed basin exceeds 2 feet and the side slopes exceed a 4:1 slope then a security barrier must be provided at the top of all basin sides. The drainage report states that the depth of water will be 2 feet, but it is not clear if this is at the 100-year event. 4. The hydrology exhibit illustrates curb openings in the proposed parking lot. Please show these curb openings in the Development Plan. 5. All new sidewalk within city right of way local roads shall be 5 feet wide per City of Tucson Development Standards 3-01-3.3 Pedestrian Circulation Paths. Please revise keynote 2 to callout for a 5-foot sidewalk and not a 4-foot sidewalk. 6. Is an access ramp required at the beginning of the proposed sidewalk at the intersection of Palo Verde Ave. and Presidio Rd.? 7. Earthwork quantities appear to exceed 50CY therefore a grading plan is required. 8. Due to the area of disturbance it appears that a Storm Water Pollution Prevention Plan (SWPPP) is required. 9. Include Maintenance checklist in the drainage report. SMDDFM 14.03 If you have any questions, I can be reached at 791-5640 x1191 or Jose.Ortiz@tucsonaz.gov |
| 06/03/2006 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES June 3, 2006 Chuck Schuiteman, AIA Sayler-Brown Bolduc Lara Arichtects, L.L.C. 1001 North Alvernon Way, Suite 105 Tucson, Arizona 85711-1019 Subject: D05-0041 AGM Container Controls Development Plan Dear Chuck: Your submittal of May 4, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter for each agency explaining how each outstanding requirement has been addressed: ALL BLUELINES MUST BE FOLDED 4 Copies Revised Development Plan (Landscape, Zoning, Engineering, DSD) 4 Copies Revised Landscape Plan (Zoning, Landscape, Engineering, DSD) Should you have any questions, please call me at 791-5608, ext. 1179. Sincerely, Patricia Y. Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 620-0535 |