Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: D05-0030
Parcel: 14029043A

Review Status: Completed

Review Details: REVISION - DEV PLAN

Permit Number - D05-0030
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/15/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
11/20/2006 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
11/21/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approved
11/27/2006 PATRICIA GILBERT ENGINEERING REVIEW Approv-Cond TO: Patricia Gehlen; CDRC Coordinator DATE: November 27, 2006

SUBJECT: Engineering review of the Development Plan, Starbucks. The activity number is D05-0030.

SUMMARY: The Development Plan and Drainage Report were received by Engineering on November 15th, 2006. Engineering has reviewed the received items and does not recommend approval of the Development Plan.

RESUBMITTAL REQUIRED: DEVELOPMENT PLAN


DEVELOPMENT PLAN

1. Identify (label) on the development the locations of the handicap parking spaces.
11/27/2006 JCLARK3 ENV SVCS REVIEW Approved * No problem with the location of the enclosure. After service the refuse trucks can depart the site by the bi-pass lane or throught the parking lot.
11/28/2006 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


WR#173512 November 27, 2006

AC Tsang Engineering Group, Inc.
Attn: Antony Tsang
4626 E Ft. Lowell, Suite S
Tucson, Arizona 85712

Dear Mr. Tsang :

SUBJECT: Starbucks at Valencia
D05-0030

Tucson Electric Power Company has reviewed and approved the development plan submitted November 15, 2006. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. TEP will need a full set of approved site, electrical load, paving off-site improvements and irrigation plans.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Tucson Electric Power Company
Attn: Ms. Mary Boice
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-917-8732

Please call the area Designer Mike Kaiser at (520) 918-8244, should you have any questions.

Sincerely,


Elizabeth Miranda
Office Support Specialist
Design/Build
lm
Enclosures
cc: P. Gehlen and F. Rodriguez, City of Tucson (email)
M. Kaiser, Tucson Electric Power
11/29/2006 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond Submit the revised landscape plan without the prior approval stamps.
12/05/2006 JIM EGAN COT NON-DSD FIRE Approved
12/06/2006 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: D05-0030 STARBUCKS AT VALENCIA/REVISED DEVELOPMENT PLAN
DATE: 12/06/05



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.


Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses.

2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection.

ES
12/15/2006 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: David Rivera
Principal Planner

PROJECT: D05-0030
Starbucks
Development Plan

TRANSMITTAL DATE: December 15, 2006

DUE DATE: December 15, 2006

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.


1. The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.

2. Label the handicapped parking spaces and drawn and label the handicapped parking signs. Ensure that the signs do not affect the sidewalk area. Minimum clear width for the sidewalk is four feet. The sign may not be placed in front of the wheel stop.

If you have any questions about this transmittal, please call, David Rivera (520) 791-5550.


C:\cdrc\developmentplan\D050030dpca.doc
12/18/2006 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D05-0030 Starbucks at Valencia 12/15/06

( ) Tentative Plat
( ) Development Plan
() Revised Landscape Plan
() Revised Development Plan
() Board of Adjustment
() Other

CROSS REFERENCE: n/a

NEIGHBORHOOD PLAN: Gerneral Plan

GATEWAY/SCENIC ROUTE: Valencia is Gateway Route

COMMENTS DUE BY: December 14, 2006

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No (applicable) Annexation or Rezoning Conditions, Not an RCP - No Comment
( ) Proposal Complies with Annexation or Rezoning Conditions
( ) RCP Proposal Complies With Plan Policies
( ) See Additional Comments Attached
( ) No Additional Comments - Complies With Planning Comments Submitted on:
() No Resubmittal Required
() Tentative Plat
() Development Plan
() Landscape Plan
() Other

REVIEWER: J. Hershenhorn 791-4505 DATE: December 14, 2006
12/19/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

December 19, 2006

Antony C. Tsang
A.C. Tsang Engineering Group, Inc.
4626 East Fort Lowell, Suite S
Tucson, Arizona 85712

Subject: D05-0030 Starbucks at Valencia Revised Development Plan

Dear Tony:

The above referenced development plan has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per the on-line comments, please submit the following documents for sign-off.

1 Double Matte right-reading Océ or Photo Mylar of the COMPLETE SET of the Development Plan, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal).
AND
1 Double Matte right-reading Océ or Photo Mylar of the Development Plan.

The extra Double Matte right-reading Océ or Photo Mylar that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete mylar set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the mylar and two (2) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options.

Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 325-0979
dpapproved