Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D05-0022
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/24/2017 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
07/24/2017 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
07/24/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
08/11/2017 | KELLY LEE | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
08/11/2017 | KLEE1 | ENV SVCS | REVIEW | Reqs Change | Trish, Environmental and General Services has completed our review of D05-0022, Commercial Lot/Block "C" and Lots 25 and 38 Menlo Park Mercado District. This is the fourth submittal of this Development Package. I have reviewed all of the review comments made by Environmental Services on the previous submittals. Based on this review, all of the comments were addressed with the exception of the following: •The applicant shall demonstrate that the refuse and recycling service vehicles can enter and exit the 35 foot loading space along Paeso De Los Zanjerso using the turning templates in Technical Standards Manual Section 8, Figure 7. If this has already been done, please have the applicant submit this information. •In "Ground Floor Plan Keynotes" on Sheet DP-4, add the following sentence: "The containers shall be positioned in the loading zone so that the service vehicle operator does not have to exit the truck". Upon receipt of these minor items, Environmental and General Services can approve the Development Package from a solid waste management standpoint. Tom Ryan, P. E. City of Tucson - Environmental and General Services Department |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/01/2017 | ARUIZ1 | OUT TO CUSTOMER | Completed |