Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D05-0022
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2016 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) A disk that contains all items submitted. 3) Items requested by reveiw staff 4) All items needed to approve these plans. |
12/02/2015 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
12/08/2015 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
12/16/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
12/17/2015 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | Good afternoon, attached is the facilities map associated with the development plan for Menlo Park – Mercado: Commercial Block c, Lots 25 & 38 that was reviewed by the area designer, Josh Necas. If you have any questions or concerns, you can reach Josh Necas at 917-8759. Thank you Michael Norris Tucson Electric Power Scheduling Coordinator 520-918-8255 mnorris@tep.com |
12/18/2015 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
12/18/2015 | JOE LINVILLE | NPPO | REVIEW | Passed | |
12/21/2015 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
12/23/2015 | BVIESTE1 | ENV SVCS | REVIEW | Reqs Change | The revised Development Plan has been reviewed on behalf of the Environmental Services Dept. and the following will need to be addressed on the resubmittal: 1. Revise the Solid Waste Collection note on the coversheet to include the waste stream calculation per TSM Section 8-01.8.0 based upon the revised uses and square footages. 2. Demonstrate that the 35 ft. long service vehicle can enter and exit the 35 ft. loading space using the turning templates in TSM Section 8, Figure 7. 3. Add a general note that states the building owner’s facility personnel shall watch for the arrival of the service vehicle and shall roll the containers out clearly into the loading space in front of the vehicle when the vehicle arrives and shall roll the containers back into the building after servicing so that the service vehicle operator does not exit the truck. If there are any questions, I can be reached at kperry@perryengineering.net |
12/23/2015 | MICHAEL ST. PAUL | HC SITE | REVIEW | Approved | Changed from pass to approval per David Rivera |
12/30/2015 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Reqs Change | SUBJECT: Rio Nuevo Mercado Block C REVISION Submittal Engineering Review LOCATION: T14S R13E Section 14 REVIEWER: Elizabeth Leibold, P.E., CPM, CFM ACTIVITY NUMBER: D05-0022-R1 SUMMARY: The Development Package including the revised Development Plan was reviewed by Engineering. Engineering has reviewed the received items and does not recommend approval of the Development Plan at this time until the following comments are addressed. COMMENTS: 1) Admin Man Sec.2-07.5.6.A: Clarify in response letter and provide copy of any updated CC&R's regarding the new areas and associated maintenance areas or common areas that will be the responsibility by condominium owners and/or which areas will be the responsibility of the owners of the commercial units. 2) Admin Man Sec.2-07.6.1.E: Address the following easement comments: a. Submit copies of easement abandonment documentation. b. Submit updated title report. c. Assure planviews reflect the current status of easements. d. Provide sequence number information once data. e. Add note to plan that conditions of T05BU01511 shall apply to future construction permits. f. Label any remaining easements with dimensions and type of easement. 3) Admin Man Sec.2-07.5.4.H: In response letter or on planview, explain whether there are changes to design for the loading / commercial / refuse collection access. Submit revised plan sheets and/or documentation and comprehensive response letter. If you have any questions on the comments, please call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Dept City of Tucson |
12/31/2015 | MICHAEL ST. PAUL | ZONING | REVIEW | Approv-Cond | Due to the building crossing property lines, the revised DP has been conditionally approved. A Pima County Accessor's Property Tax Parcel Combo must be completed prior to sign off by the CDRC Project Manager. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/26/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |