Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - DEV PLAN
Permit Number - D05-0019
Review Name: REVISION - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/23/2005 | MARILYN KALTHOFF | START | PLANS SUBMITTED | Completed | |
05/24/2005 | JIM EGAN | COT NON-DSD | FIRE | Approved | The Development Plan is approved May 24, 2005. |
05/26/2005 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: JOHAN TAVERN D05-0019 Tucson Electric Power Company has reviewed and approved the Development Plan submitted for review May 23, 2005. There are electrical facilities dividing the common lot corner of Lots 83 and 84 that do not appear to be in conflict. If additional electrical service is required for the addition, apply by calling the New Construction Department at (520) 770-2062. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Juan Valenzuela Design/Build - DB102 Tucson Electric Power Company P. O. Box 711 Tucson, AZ 85702 Please call me at (520) 917-8745, should you have any questions. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com <mailto:lcastillo@tep.com> |
05/31/2005 | JCLARK3 | ENV SVCS | REVIEW | Approv-Cond | * No known landfill with in 1000 feet of this development. * A letter was sent on April 1, 2005 stating that curb-side service for this multiple type of business is approved. If additional service is required or additional curb-side plastic container are required then arrangements can be made by contacting ES at 791-3272. * It was futher pointed out in the letter that like multi-use properties in the area should consider commercial dumpster service and an appriopriate dumpster enclosure be constructed. |
06/04/2005 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Denied | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D05-0019 Johan Tavern 6/3/2005 ( ) Tentative Plat () Development Plan ( ) Landscape Plan ( ) Revised Plan/Plat ( ) Board of Adjustment ( ) Other CROSS REFERENCE: PAD-12 Civano Master PAD NEIGHBORHOOD PLAN: South Pantano Area Plan GATEWAY/SCENIC ROUTE: N/A COMMENTS DUE BY: June 7, 2005 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: ( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment ( ) Proposal Complies with Annexation or Rezoning Conditions ( ) RCP Proposal Complies With Plan Policies () See Additional Comments Attached ( ) No Additional Comments - Complies With Planning Comments Submitted on: () Resubmittal Required: ( ) Tentative Plat () Development Plan ( ) Landscape Plan () Other (parking inventory) REVIEWER: K. Aragonez 791-4505 DATE: June 1, 2005 Per Exhibit 41 Projected Land Use Intensities, in the Civano Master PAD, there are limits placed on the number of dwelling units (DUs) and commercial square footage within the block that the proposed project lies. Per this Exhibit the number of DUs for this specified area is between 24 and 50 units, and the allowable total square footage for commercial is 4-6,000 square feet. Current totals including the proposed project are to be provided on the development plan. Please provide information as to how the project complies to MOU 5.3.1.2. This requires that all non-residential building permits are to provide certification that the plans as submitted provide for a total energy use through the building shell, heating and cooling systems of at least a 55% reduction for each structure from the annual energy use by a comparable non-residential structure in 1990 as established by the Model Energy Code. This can be accomplished by self-certification. A note may be placed on the development plan indicating compliance. Please provide a copy of the updated parking inventory that is prepared by Swaim and Associates for verification by staff. |
06/04/2005 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D05-0019 JOHAN TAVERN/REVISED DEVELOPMENT PLAN DATE: JUNE 2, 2005 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: 1: Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2: All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. jg |
06/06/2005 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
06/06/2005 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
06/07/2005 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this DP. D. Dale Kelch, PE Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
06/07/2005 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Michael St.Paul FOR: David G. Rivera Planning Technician Principal Planner PROJECT: D05-0019 Johan Tavern: Revision See D03-0014 TRANSMITTAL: June 7, 2005 DUE DATE: June 7, 2005 COMMENTS CODE SECTION/ DEVELOPMENT STANDARD 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is May 24, 2006. LUC Sec 5.3.8.2 2. Please provide the number of parking spaces required and provided on the development plan. Also provide an updated Civano I Parking Inventory for the Neighborhood Center District. Civano Phase I Specific plan, page 35 |
06/08/2005 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed |