Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: D05-0008
Parcel: 11521017H

Review Status: Completed

Review Details: DEVELOPMENT PLAN

Permit Number - D05-0008
Review Name: DEVELOPMENT PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/22/2005 DBELL1 LANDFILL ENVIRONMENTAL SERVICES Approved
03/22/2005 JIM EGAN COT NON-DSD FIRE Approved The Development Plan is approved March 22, 2005.
03/25/2005 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: D05-0008 SILVERBELL PAVILION RETAIL/DEVELOPMENT PLAN
DATE: MARCH 24, 2005



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.

APPROVED WITH THE CONDITION THAT THE FOLLOWING ITEM IS LABELED ON THE APPROVED MYLAR:
LABEL BK. 53, PG. 41 TO LOTS 3 AND 4 OF EL RIO PLAZA
(SHEETS 1 AND 2).

NOTE:

1. Submit a 24 x 36 Mylar of approved Development Plan to City Planning. Signed and dated mylar will be forwarded to Pima County Addressing prior to the assignment of addresses.

2. All addresses will need to be displayed per Pima County Address Standards at the time of final inspection.








jg
03/25/2005 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved NO COMMENT
D05-0008
KREBS CARHUFF ARCHITECTS
SILVERBELL PAVILION RETAIL
04/04/2005 JCLARK3 ENV SVCS REVIEW Denied * Dragoon Landfill is over 1000 feet of this development and is outside the landfill ordiance.
* A double enclosure is shown on the SE corner of the development plan. No provisions are stated on how the enclosure can be serviced from an adjacent property.
* No details of the enclosure is provided.
04/06/2005 TIM ROWE PIMA COUNTY WASTEWATER Denied April 6, 2005

TO: Philip A. Carhuff
Krebs Carhuff Architects

THRU: Craig Gross
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: Silverbell Pavillion
Development Plan – 1st Submittal
D05-0008


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This project will be tributary to the Roger Road Wastewater Treatment Facility via the Northwest Outfall Interceptor. Provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. Contact Robert Decker, PCWWM Planning Services, at (520) 740-6625 regarding this matter.

Based on the evaluation of the site, this project would qualify for Non-Participating sewer connection fee rates.

ALL SHEETS. Add the project number, D05-0008, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers.

SHEET 1. Ad the following General Note as shown below and fill in the blanks appropriately

THIS PROJECT HAS ____ PROPOSED AND ____ EXISTING WASTEWATER FIXTURE UNIT EQUIVALENTS, PER TABLE 13.20.045(E)(1) IN PIMA COUNTY CODE 13.20.045(E).

SHEET 1. Add the following General Note

MAINTENANCE AND OPERATION OF THE PRIVATE SANITARY SEWER TO ITS POINT OF CONNECTION TO THE PUBLIC SEWER IS THE RESPONSIBILITY OF THE PROPERTY OWNER.

SHEET 1. Add the following General Note

THE REQUIRED OFF-SITE PUBLIC SANITARY SEWER LINE WILL BE DESIGNED AND CONSTRUCTED TO PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT STANDARDS.

SHEET 4. Show the length, size and slope of the proposed private sewer all the way to the point of connection to the existing public sewer.

We will require a revised set of drawings and a response letter addressing each comment. Additional comments may be made during the review of these documents.

The next submittal of this project will be the 2nd submittal. A check for the review fee of this submittal in the amount of $100.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter.

For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly.

If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
04/06/2005 TIM ROWE PIMA COUNTY WASTEWATER Denied April 25, 2005

TO: Philip A. Carhuff
Krebs Carhuff Architects

THRU: Craig Gross
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: Silverbell Pavillion
Development Plan – 1st Submittal (Additional Review Comments)
D05-0008


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


A review by the Pima County Wastewater Management Department’s Design Division is required for this project. Prior to your second submittal please contact Howard Woolsoncroft at (520) 617-8207 regarding this matter. A detailed design of the proposed sewer layout and force main design will be required.

This development plan may not be approved until the subject force main design is approved by Pima County Wastewater Management.

If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
04/11/2005 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Denied SUBJECT: SILVERBELL PAVILION RETAIL
D05-0008

Tucson Electric Power Company (TEP) has reviewed the plans dated March 9,
2005. TEP is unable to approve the plans at this time. There are existing
electrical facilities within the boundaries of this project. In order for
TEP to approve the plans, the existing facilities must properly be depicted
on the plans as well as the easement recording information.

Enclosed is a copy of a TEP facility map and the development plan showing
the approximate location of the existing facilities. The existing
transformer (ERP-68) appears to be in conflict with the proposed parking
area. All cost associated with the relocation of the facilities in conflict
will be billable to the developer.

Please resubmit two revised bluelines to the City of Tucson for TEP's
review. You may contact me at (520) 917-8745 if you have any questions.


Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com <mailto:lcastillo@tep.com>
04/13/2005 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D05-0008 Silverbell Pavilion Retail 04/12/05

( ) Tentative Plat
(XXXX) Development Plan
(XXXX) Landscape Plan
( ) Revised Plan/Plat
( ) Board of Adjustment
(XXXX) Other - Irrigation Plan & Utilities an

CROSS REFERENCE: Annexation - C9-60-39

NEIGHBORHOOD PLAN: Santa Cruz

GATEWAY/SCENIC ROUTE:

COMMENTS DUE BY: 04/18/05

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment
( ) Proposal Complies with Annexation or Rezoning Conditions
( ) RCP Proposal Complies With Plan Policies
(XXXX) See Additional Comments Attached
( ) No Additional Comments - Complies With Planning Comments Submitted on:
(XXXX) Resubmittal Required:
( ) Tentative Plat
(XXXX) Development Plan
(XXXX) Landscape Plan
( ) Other

REVIEWER: DCE 791-4505 DATE: 04/11/05
Department of Urban Planning and Design Comments
D05-0008, Silverbell Pavilion Retail

Staff offers the following comments:

1. The Santa Cruz Area Plan and Design Guidelines Manual state that higher quality facades, at the rear and sides of new buildings, and rooflines should be constructed through careful design and detailing. Building facades at the rear and side and rooflines shall be designed with attention to architectural character and detail comparable to the front façade, with consistent design treatment, including but not limited to, comparable color palette, signs, lighting, screen walls, rooflines, and materials. Please submit elevation drawings of all sides of the development.

2. The Santa Cruz Area Plan, General Plan, and Design Guidelines Manual state that signage should be an appropriate scale, height, and color to integrate with development and enhance the experience and perception through scale and mass. Please show the proposed sign package and demonstrate how the proposed signage and surrounding landscape work mutually to adhere to the goals of the applicable plans.

3. Provide a note to the General Notes Section on the Development Plan that reads "all masonry walls shall be constructed of, or painted with, graffiti-resistant materials and shall be maintained in a graffiti-free condition. Please show a detail of the proposed masonry walls and indicate that they will be graffiti-resistant and what material they will be constructed of.
04/15/2005 PETER MCLAUGHLIN ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Center
Plans Coordination Office

FROM: Peter McLaughlin
Senior Planner

FOR: David Rivera
Principal Planner

PROJECT:
D05-008
Silverbell Pavilion Retail
Silverbell Road
Development Plan

TRANSMITTAL: April 15, 2005
DUE DATE: April 18, 2005


1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for full CDRC review. The one year expiration date for this development plan is March 20, 2006.

2. Place the development plan number (D05-008) on each sheet of the development plan, landscape plan and NPPO plans in the lower right hand corner near the title block.
DS 2-05.2.1.K

3. Continuous pedestrian circulation must connect the building to the Silverbell Road right-of-way. Revise to show connection.
DS 2-08

4. Dimension the depth of the back-up spurs at the north end of both parking aisles. A minimum of 3 feet for the back-up spur is required as well as an additional 3 feet between the curbed wheel barrier of the back-up spur and the wall along the north property line. DS 3-05.2.2.D

5. The location of the loading zone does not allow for truck maneuverability into and out of the space. Revise plan.
DS 2-05.2.4.O

6. With 59 vehicle total vehicle parking spaces proposed, three handicapped parking spaces must be provided on the site. Revise plan to show three h/c spaces and provide a h/c parking calculation stating the number of h/c spaces required and provided.
ANS/ IBC
DS 2-05.2.4.P

7. Six class 2 bicycle parking spaces are shown on the drawing near the northwest corner of the site. The calculations indicate that there will be four class 2 spaces and two class 1 spaces. Revise the bicycle parking calculation to be consistent with the drawing and show the location of the class 1 bicycle parking proposed. Also, provide a detail showing a fully dimensioned layout of class 1 and class 2 bicycle parking (including width and length of spaces and a 5-foot clear area for bicycle maneuverability per DS 2-09). LUC 3.3.5.6.B.2
DS 2-05.2.4..Q

8. Based on the square footage of the beauty supply retail store (1251 square feet) only 6 vehicle parking spaces are required. Revise parking calcs to be correct.
DS 2-05.2.4.P

9. Add existing and future sight visibility triangles at the access drive to Silverbell Road.
DS 2-05.2.4.I

10. It is acknowledged that the property to the south is currently under the same ownership as the subject property. A cross access agreement must be recorded between the subject property and the property to the south. The agreement must include cross access provisions for both the vehicle drive and the dumpsters, which are proposed to be accessed from the property to the south. Provide a copy of the recorded agreement and add the docket and page of recordation to the plat.
DS 2-05.2.4.P & .G

11. In addition to the development designator, place a general note on the plan detailing the restrictions which the proposed uses are subject to. In the C-1 zone, the food service use is subject to LUC 3.5.4.6.A and .C. The personal service use is subject to LUC 3.5.4.13.A. The financial service is subject to LUC 3.5.4.5.A. The general merchandise sales use is subject to LUC 3.5.9.2.C. Demonstrate compliance on the plan all applicable restrictions.
LUC 2.5.3.2

12. Add a general note stating that the proposal meets the criteria of LUC Sec. 2.8.3, Major Streets & Routes (MS&R) Setback Zone. DS 2-05.2.B.10

13. Indicate the location, height, and dimensions of any proposed freestanding signage. Also, indicate if any freestanding lighting is proposed. DS 2-05.2.4.W

14. All requested changes must be made to the Development Plan and Landscape Plan. DS 2-07.2.1.A


If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.

RESUBMITTAL OF THE FOLLOWING ITEMS IS REQUIRED: revised development plan, cross access/cross parking agreement
04/15/2005 GLENN HICKS COT NON-DSD PARKS & RECREATION Approved DATE: April 15, 2005

TO: Ferne Rodriguez, Development Services

FROM: Glenn Hicks, Parks and Recreation

SUBJECT: CDRC Transmittal, D05-0008 Silverbell Pavilion Retail: Development Plan

CC: Craig Gross, Development Services


No comments.





Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov
04/18/2005 JOE LINVILLE LANDSCAPE REVIEW Denied The Landscape Section Does not recommend approval at this time. Revise the plans as indicated in the comments below and as requested by other agencies. Revise the development and grading plans as necessary to conform to specific landscape comments.

1) Revise all tree planting areas to comply with LUC 3.7.2.3.A.1.c. Planters are required to be a minimum of four feet wide (inside dimension) and must contain a minimum of thirty-four square feet. Provide dimensions for all planting areas on the site/landscape plans.

2) Arrange parking lot canopy trees such that no parking space is more than forty feet away from the trunk of a canopy tree. LUC 3.7.2.3.A.1.a

3) Revise the plan as necessary to ensure that a twenty-five (25) foot minimum height clearance, free of any overhead
obstructions (wires, branches, etc.), will be provided above the collection site per DS 6-01.4.1.B. Trees branches may not overhang collection area.

4) Design the placement of trees in coordination with the lights, so that the trees, at maturity, do not diminish the purpose of the lights. Potential conflicts such as this could result in the elimination or the extensive trimming of trees.
DS 2-06.2.2.J
A minimum distance between the tree from the light standard in the island along Silverbell may be appropriate.

5) Include additional curbing or other appropriate barrier to
prevent parked vehicles from damaging adjacent walls in the southern parking row along Silverbell Road. DS 3-01.2.3.C.1

6) Show the future sight visibility triangles on the site and landscape plans. Revise the landscape plans to ensure that all plantings provide the required sight distance. DS 3-01.5.0

7) Revise the landscape plans to locate the Acacia greggii to minimize potential hazards people parking vehicles . These plants should be located in a location where pedestrians are not likely to venture. LUC 3.7.2.8


RESUBMITTAL OF ALL PLANS IS REQUIRED. THE NATIVE PLANT PRESERVATION APPLICATION FOR EXCEPTION IS APPROVED.
04/19/2005 FRODRIG2 COT NON-DSD REAL ESTATE Approved No real estate issues.
04/22/2005 LOREN MAKUS ENGINEERING REVIEW Denied DATE: April 22, 2005

To: Craig Gross
Planning Administrator
FROM: Loren Makus, EIT
Engineering Division


SUBJECT: Silverbell Pavilion
Development Plan D05-0008 (First Review)
T14S, R13E, Section 03

RESUBMITTAL REQUIRED: Revised Development Plan and Revised Drainage Report

The Engineering Division has reviewed the Development Plan and Drainage Report for Silverbell Pavilion and does not recommend approval at this time.

Development Plan Comments:

1. Provide recordation information for easements associated with the drainage structures through the property. This box culvert was constructed under public improvement plan number I-84-044. Any construction within the easement will require the written permission of City Engineer Andy Dinauer. Based on discussions with the Department of Transportation, it is unlikely that permission will be granted for any structure within the drainage and access easements.
2. Provide recordation information for cross access easements and joint use agreements for this property and for the property with which it will share access and facilities.
3. Provide the correct sight visiblity triangle descriptions.
4. The proposed driveway does not meet the Transportation access management guidelines. Revise the driveway to provide the required curb return radii.


Drainage Report Comments:

5. Provide threshold retention for the project as required by the Standards Manual for Drainage Design and Floodplain Management in Tucson Arizona (Drainage Manual), Section 14.2.1. Five-year threshold retention is required. Provide required calculations and details for the retention basin
6. Revise the Long Term Maintenance Responsibilty. The "wash" crossing this property appears to be fully contained within the box culvert. Explain which wash will be maintained by the property owner. Provide for assignement of all the required maintenance as described in the Drainage Manual Section 2.3.1.2.E.
7. Revise last statement in the Hydrologic Analysis of Local Offsite Drainage. The referenced FIRM panel only addresses mapped special flood hazard areas and does not address other local drainage issues.
8. Revise the purpose statement to indicate that the project is within a balanced basin.
9. Revise the Detention Analysis to provide consistent description of the expected depths within the basin and within the vehicle use areas.
10. The conclusion section references a north wash which does not appear on the site plan or on the development plan. Clarify the references to the wash throughout the report.
11. Provide the Basin Location and Description information as described in the Drainage Manual, Section 2.3.1.6,

Submit a revised Development Plan and a revised Drainage Report along with a letter that provides a detailed discussion of how each comment has been addressed.

A complete grading permit submittal Plan will be required for this project once the Development Plan has been approved.
If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov.

Loren Makus, EIT
Senior Engineering Associate
04/25/2005 DALE KELCH COT NON-DSD TRAFFIC Denied Traffic Engineering REJECTS this DP:

1. The access points shall have 25' radius curb returns. (DS 3-01.0 figure 6)

2. List the name, ROW width, recordation data, type and dimensioned with of paving, curbs, curb cuts and sidewalks. (DS 2-05.2.2.D)

3. The symbol used for new signs (Detail 2/2) is not correct in accordance with Standard Details for Public Improvements, SD100, 2003 edition.

D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
04/27/2005 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

April 29, 2005

Philip A Carhuff, AIA
Krebs Carhuff Architects
3149 East Prince Road
Tucson, AZ 85716

Subject: D05-0008 Silverbell Pavilion Retail Center Development Plan

Dear Phil:

Your submittal of March 21, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter for each agency explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

9 Copies Revised Development Plan (environmental services, waste water, TEP, urban planning and design, engineering, zoning, landscaping, traffic, DSD)

4 Copies Revised Landscape Plan (zoning, engineering, landscaping, DSD)

2 Copies Revised Drainage Report (engineering, DSD)



Should you have any questions, please call me at 791-5608, ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 577-4599
04/27/2005 CRAIG GROSS OTHER AGENCIES PIMA ASSN OF GOVTS Passed 321 ESTIMATED DAILY TRIP IN 24HR PERIOD.