Permit Number: D05-0006
Parcel: 116122810

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - DEV PLAN

Permit Number - D05-0006
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/21/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
11/21/2005 MATT FLICK ENGINEERING REVIEW Approved Drainage report acceptable for development plan purposes only.

Basis of bearings not found on plan. Not significant for this development.
11/29/2005 ANDREW CONNOR LANDSCAPE REVIEW Denied Landscape approval upon completion of zoning review and all comments addressed.
12/01/2005 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D05-0006 Palo Verde Realty 12/01/05

() Tentative Plat
(X) Development Plan
(X) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-02-12

NEIGHBORHOOD PLAN: Manzo Neighborhood Plan/Santa Cruz Area Plan

GATEWAY/SCENIC ROUTE: No

COMMENTS DUE BY: 12/06/05

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
(X) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
(X) Resubmittal Required:
() Tentative Plat
(X) Development Plan
(X) Landscape Plan
() Other



REVIEWER: msp 791-4505 DATE: 11/30/05
Department of Urban Planning and Design Comments
D05-0006, Palo Verde Realty
November 30, 2005

As with the previous staff review dated September 9, 2005, the development plan is not in compliance with rezoning case C9-02-12, rezoning condition # 5, which reads:

A six foot high masonry wall shall be locates on the north property boundary with twenty-four (24) inch box canopy trees planted south of the wall a maximum of twenty-five (25) feet apart.


The submittal dated November 21, 2005 provides a six-foot high masonry wall along the north property boundary with twenty-four (24) inch box canopy trees planted south of the wall a maximum of thirty-five feet apart.

As mentioned by staff in the previous review, the site design, to date, does not comply with rezoning condition #5. The applicant is required to revise the development plan to comply with all rezoning conditions or contact City of Tucson Department of Development Services, Rezoning Section to address this issue.
12/05/2005 DAN CASTRO ZONING REVIEW Approv-Cond The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements.

1.
The acceptable development plan is comprised of five (5) sheets, which contains a present and future site and landscape plan and a fifth sheet, which notes the rezoning conditions.

If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608 ext. 1180.
12/09/2005 FRODRIG2 PIMA COUNTY WASTEWATER Approved December 08, 2005

To: Eduardo J. Ornelas, Arquitecto E. J. Ornelas & Associates

Thru: Patricia Gehlen, CDRC Project Manager
City of Tucson Development Services Department

____________________________________
From: Michael Harrington (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Palo Verde Realty
Development Plan –4th Submittal
D05-0006

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.



The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter

CC: Project File
12/14/2005 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

December 14, 2005

Eduardo Ornelas
Arquitecto E.J. Ornelas and Associates
100 North Stone Avenue, Suite 1002
Tucson, AZ 85701

Subject: D05-0006 Palo Verde Realty Development Plan

Dear Eduardo:

Your submittal of November 21, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter for each agency explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

4 Copies Revised Development Plan (Community Planning, Zoning, Landscape, DSD)

4 Copies Revised Landscape Plan (Zoning, Community Planning, Landscape, DSD)



Should you have any questions, please call me at 791-5608, ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 624-0747