Permit Number: D04-0032
Parcel: 133452200

Review Status: Completed

Review Details: RESUBMITTAL - DEVELOPMENT PLAN

Permit Number - D04-0032
Review Name: RESUBMITTAL - DEVELOPMENT PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/22/2004 FRODRIG2 START PLANS SUBMITTED Completed
10/25/2004 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Include the numbers of any related cases in the lower corner of the landscape plans. Include D03-002.

2) Include a reference to the previous NPP plan on the new plan, as the new plan does not fully conform to the development standard. Include designations for protected plants on the site. According the previous plans #'s 1, 2, 52, & 53 were to be transplanted. The final location of #1 could not verifed, please clarify.
10/27/2004 JCLARK3 ENV SVCS REVIEW Approved
10/29/2004 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: EASTPOINTE COMMERCIAL CENTER
D04-0032

Tucson Electric Power Company has reviewed and approved the development plan
dated October 21, 2004. It appears that there are no conflicts with the
existing facilities within the boundaries of this proposed development.

Please make application for electric service by calling the New Construction
Department at (520) 770-2062. Submit a final set of plans including
electrical load plans, to determine how TEP will serve this commercial
development. If easements are required, they will be secured by separate
instrument.

Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8745
Cell Phone: (520) 904-2668
Fax: (520) 917-8700
11/02/2004 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D04-0032 Eastpointe Commercial Center 11/01/04

() Tentative Plat
(x) Development Plan
(x) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-83-09 & C10-99-55

NEIGHBORHOOD PLAN: Pantano East Area Plan

GATEWAY/SCENIC ROUTE: Scenic Route

COMMENTS DUE BY: November 04, 2004

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
(x) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
(x) Resubmittal Required:
() Tentative Plat
(x) Development Plan
(x) Landscape Plan
() Other

REVIEWER: E. Anderson 791-4505 DATE: 11/01/04

Department of Urban Planning and Design Comments
Eastpointe Commercial Center – D04-0032: 2nd submittal

1. Please connect the pedestrian connection walkway from the property to the north to pedestrian connection walkway for the proposed development.

2. Please place all the zoning conditions (C9-83-09) on the development plan.
11/03/2004 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond November 2, 2004

TO: Adam Siros
DPA Architects

THRU: Craig Gross
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: Eastpointe Commercial Center, Lots 1-5
Development Plan – 2nd Submittal
D04-0032


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


A private Sewer Service Agreement for the proposed number of wastewater fixture unit equivalents has been sent to your office. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve the development plan.

Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the tentative plat.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
11/08/2004 DAVID RIVERA ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: David Rivera Senior Planner

FOR: Patricia Gehlen
Principal Planner

PROJECT: D04-0032
Eastpointe Commercial Center - Lot 2
Development Plan

TRANSMITTAL: November 8, 2004

DUE DATE: November 4, 2004

COMMENTS:

1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is August 24, 2005.

2. Please address the following items. Per my discussion with Tom Hackett on October 8, 2004, the following items were to be revised, corrected, or added to the plan.

a. The parking calculations must be revised to list the number of parking spaces that will be provided on each lot. Also the total number of parking spaces must be revised to list the actual total based on the revised drawing. Per my count of the parking spaces on sheet A1.0 the total number of spaces that will be provided is 278. Please review sheet A1.0 and verify the number of parking spaces.

b. All PAAL areas that are designed for two-way traffic must be 24 feet wide. The north/south PAAL along the west side of the building must be 24 feet in width. Please revise the dimension from 23.86 feet to 24 feet.

c. Label the width of the third drive-through lane. The minimum width is nine feet. Four stacking spaces must be depicted, dimensioned and labeled. The minimum dimensions for a stacking space is 8.5 feet wide by 18 feet long. Please add the spaces as required.

d. The escape lane between the third drive-through lane and the loading zone must be labeled and dimensioned. The lane must be a minimum of 12 feet wide and must be labeled as one way.

e. Please re-submit three copies of the color renderings of the building elevations. As discussed with Tom, the color palette and the renderings did not match. Please place the color palette on the rendering sheets.

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

DGR C:\planning\cdrc\tentativeplat\D040032tp.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, land landscape plans, and additional requested documents
11/08/2004 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed