Review Date Reviewer's Name Type of Review Description Status Comments
10/21/2004 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
10/22/2004 PAUL MACHADO ENGINEERING REVIEW Approved
10/25/2004 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Revise the plans to include curbing or other approved barrier for the truck turn around. DS 3-01.5.0

2) Revise the landscape plan to include revegetion per LUC 3.7.5.2 for disturbed portions of the adjacent public right of way. Show that plantings and or the native seed mix will used to restore disturbed areas on the landscape plan.

3) Revise the native plant preservation plan to utilize the same limits of construction/grading shown on the development plan and landscape plans for Phase 1. The plans received are unclear as to the location and extent parking improvements.

RESUBMITTAL OF ALL PLANS IS REQUIRED.

An SCZ approval is required prior to development plan approval.
11/04/2004 ELAINE ROSE ZONING REVIEW Denied CDRC TRANSMITTAL


TO: Development Services Center
Plans Coordination Office

FROM: Peter McLaughlin
Senior Planner

FOR: Patricia Gehlen
Principal Planner

PROJECT:
D04-027
Rincon Mountain Presbyterian Church
8445 E. Tanque Verde Road
Development Plan

TRANSMITTAL: 11-4-04
DUE DATE: 11-4-04


1. The Scenic Corridor Zone (SCZ) application must be approved prior to development plan approval.
DS 2-05.2.2.B.10

2. All lettering and dimensions shall be a minimum of twelve point (0.12") in size for microfilming/archiving purposes. Revise all text on sheet 1 of 3 which does not meet this minimum standard. DS 2-05.2.1.C

3. Some of the keynote numbers are struck over by the grading limits line. Revise so that all keynote labels are legible.

4. Sidewalks within the project must be physically separated from vehicular travel lanes and parking spaces by means of curbing, except at crosswalks. Label and dimension the width of the pedestrian circulation system clearly on the drawing. Label and dimension the feature that extends southward from the center front of future building 2. Is this a sidewalk/crosswalk? It is not clear on the plan where or if the pedestrian sidewalk connects to the right-of-way along Tanque Verde Road. The pedestrian sidewalk must connect all areas of the development and must provide connections between the building to sidewalks along the adjacent street frontages.
DS 2-08.4.1

If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
11/09/2004 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed
11/09/2004 DALE KELCH COT NON-DSD TRAFFIC Approved Traffic Engineering recommends APPROVAL of this DP.

D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)