Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - DEVELOPMENT PLAN
Permit Number - D04-0011
Review Name: RESUBMITTAL - DEVELOPMENT PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/14/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
05/19/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D04-0011 PIMA FEDERAL CREDIT UNION/REVISED DEVELOPMENT PLAN DATE: May 18, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: 1. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2. All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. jg |
05/24/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approv-Cond | TO: Development Services Center Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: D04-011 Pima Federal Credit Union Broadway Pantano Center Development Plan TRANSMITTAL: May 24, 1004 DUE DATE: May 27, 2004 The Zoning Review Section approves the development plan for this project, subject to the following change on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements. 1. Revise the MS&R street perimeter yard setback to be dimensioned from curb location rather than from property line. LUC 3.2.6.5 2. Add the maximum slope of the handicap access aisles to the typical van accessible parking detail. ANS 3. Provide a copy of recorded cross access agreement with Lot 5 to the west. Label the docket and page of recordation on the plan. DS 2-05.2.4.G If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
05/24/2004 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this DP D. Dale Kelch, EIT Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
05/24/2004 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approved | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D04-0011 Pima Federal Credit Union 05/20/04 () Tentative Plat (x) Development Plan (x) Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other CROSS REFERENCE: C9-78-36, C9-84-50 & C9-00-39 NEIGHBORHOOD PLAN: Pantano East Area Plan GATEWAY/SCENIC ROUTE: Gateway Corridor COMMENTS DUE BY: May 27, 2004 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP - No Comment () Proposal Complies with Annexation or Rezoning Conditions () RCP Proposal Complies With Plan Policies (x) See Additional Comments Attached () No Additional Comments - Complies With Planning Comments Submitted on: (x) Resubmittal Required: () Tentative Plat (x) Development Plan ( ) Landscape Plan () Other REVIEWER: E. Anderson 791-4505 DATE: 05/20/04 Department of Urban Planning and Design Review Comments D04-0011 – 2nd Review 1. Please provide a painted or textured pedestrian crosswalk that connects the eight feet wide sidewalk to the south of the property to the sidewalk along Pantano Road. |
05/24/2004 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approved | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D04-0011 Pima Federal Credit Union 06/04/04 () Tentative Plat (x) Development Plan (x) Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other CROSS REFERENCE: C9-78-36, C9-84-50 & C9-00-39 NEIGHBORHOOD PLAN: Pantano East Area Plan GATEWAY/SCENIC ROUTE: Gateway Corridor COMMENTS DUE BY: May 27, 2004 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP - No Comment () Proposal Complies with Annexation or Rezoning Conditions () RCP Proposal Complies With Plan Policies (x) See Additional Comments Attached (x) No Additional Comments - Complies With Planning Comments Submitted on: ( ) Resubmittal Required: () Tentative Plat ( ) Development Plan ( ) Landscape Plan () Other REVIEWER: E. Anderson 791-4505 DATE: 06/04/04 Department of Urban Planning and Design Review Comments D04-0011 – 3rd Review The applicant has asked that the painted or textured pedestrian crosswalk be placed on the mylar. To not require a full third review, it is acceptable for the applicant to place the painted or textured pedestrian crosswalk on the mylar, subject to DSD verification. |
05/26/2004 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | Revise the development plan to include the loading area screening proposed on the landscape plan. Revise curbing shown on the the landscape and development plans to match in the vicinity of the refuse storage area. DS 2-07.2.0 NO RESUBMITTAL REQUIRED, MAKE ALL REQUESTED CHANGES. |
05/28/2004 | JCLARK3 | ENV SVCS | REVIEW | Approved | The dumpster location as shown in the resubmittal is approved for service. |
06/02/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Approv-Cond | DATE: June 2, 2004 To: Craig Gross Planning Administrator FROM: Loren Makus Engineering Division SUBJECT: Pima Federal Credit Union Development Plan D04-0011 (Second Review) T15S, R15E, Section 08 RESUBMITTAL REQUIRED: Development Plan. The Engineering Section has reviewed the Development Plan (DP) and Drainage Statement for Pima Federal Credit Union and does not recommend approval of the DP at this time. The DS is accepted for DP review purposes. The following review comments need to be addressed in the next submittal. Development Plan: 1. The sidewalk along Pantano Road is shown as discontinuous. Revise the plan so that it is consistent with the previously approved development plan for the larger development and with the rezoning conditions. 2. Revise the sight visibility triangle north of Centrepark Drive to 345 feet. (City of Tucson Development Standard (DS) 3-01.5) 3. Revise note 5 to provide the language from the Development Standard. (DS 2-05.2.2.E) 4. Show roof drainage patterns and add a note indicating that all sidewalks and pedestrian paths will be kept flood free for up to a 10-year event. (DS 2-05.2.4.H.2 and DS 2-08.3.1) 5. Show how that drainage patterns will comply with rezoning conditions 16 and 19. Revise the drainage patterns and proposed grades to comply with these conditions. (DS 2-05.2.3.B) If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov. Loren Makus, EIT Senior Engineering Associate 6-11-04 After a meeting with Tony Tsang, I agreed to approve this Development Plan if I can confirm that the following items are corrected on the final version. 1. The sidewalk along Pantano Road is shown as discontinuous. Revise the plan so that it is consistent with the previously approved development plan for the larger development and with the rezoning conditions. 2. Revise the sight visibility triangle north of Centrepark Drive to 345 feet. (City of Tucson Development Standard (DS) 3-01.5) 3. Show roof drainage patterns and add a note indicating that all sidewalks and pedestrian paths will be kept flood free for up to a 10-year event. (DS 2-05.2.4.H.2 and DS 2-08.3.1) Loren Makus, EIT Senior Engineering Associate |
06/07/2004 | MARILYN KALTHOFF | PIMA COUNTY | WASTEWATER | Approv-Cond | June 7, 2004 TO: Tony Tsang, A. C. Tsang Engineering THRU: Dickie Fernandez FROM: ____________________________________ representing the Pima County Departments of Wastewater Management and Environmental Quality SUBJECT: Pima Federal Credit Union (Pantano Road) - Submittal D04-0011 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. SHEET 1. The legend shows symbols for the sewer line and sewer manhole that do not match those symbols used within the layout. Please revise these symbols in the legend to show the following: Proposed sewer line. Existing sewer line. Proposed manhole. Existing manholes. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you wish to discuss the above comments, please contact me at the phone number provided above, under my signature. Copy: Project |