Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - DEVELOPMENT PLAN
Permit Number - D04-0010
Review Name: RESUBMITTAL - DEVELOPMENT PLAN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/19/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 05/24/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D04-0010 HIGHLANDS FREE SCHOOL / DEVELOPMENT PLAN DATE: May 20, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: 1. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2. All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. |
| 05/26/2004 | DAN CASTRO | ZONING | REVIEW | Approv-Cond | The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements. 1. Revise general note six (6) on sheet 1 of 3 from lot coverage to floor area ratio calculation. Floor area ratio is calculated by adding the overall gross floor area divided by the gross site area. Refer to LUC 3.2.11 for additional information. Per approved variance, F.A.R. may not exceed .21. (D.S. 2-05.2.4.M) 2. Provide the lot coverage calculation. Lot coverage is comprised of all enclosed building footprints and vehicular use area divided by the gross site area. For additional information refer to LUC 3.2.9. Per approved variance, lot coverage may not exceed 30%. (D.S. 2-05.2.4.M) If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608. |
| 05/28/2004 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Denied | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D04-0010 Highlands Free School 5/28/04 ( ) Tentative Plat (XXXX) Development Plan (XXXX) Landscape Plan ( ) Revised Plan/Plat ( ) Board of Adjustment ( ) Other CROSS REFERENCE: SE-03-04 NEIGHBORHOOD PLAN: Arroyo Chico GATEWAY/SCENIC ROUTE: n/a COMMENTS DUE BY: 06/01/04 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: ( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment ( ) Proposal Complies with Annexation or Rezoning Conditions ( ) RCP Proposal Complies With Plan Policies ( ) See Additional Comments Attached ( ) No Additional Comments - Complies With Planning Comments Submitted on: (XXXX) Resubmittal Required: ( ) Tentative Plat ( ) Development Plan ( ) Landscape Plan (XXXX) Other - Photos, elevations and color palette. REVIEWER: DCE 791-4505 DATE: 05/28/04 DEPARTMENT OF URBAN PLANNING AND DESIGN HIGHLANDS FREE SCHOOL REVIEW COMMENTS D04-0011 1. The color drawing and the elevation drawings do not match. The elevations illustrate a stone veneer being used for the new structure. Such veneer does not appear on the color drawings. Please provide color drawings showing the veneer and a description on the elevations of the type of material that will be utilized. 2. Please provide color photographs of existing structures to demonstrate compatibility with new proposed two-story building. |
| 05/28/2004 | JCLARK3 | ENV SVCS | REVIEW | Approved | Approved based on letter correspondence of service being a rollout type service dtd May 26, 04 from ES. |
| 06/01/2004 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
| 06/02/2004 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Denied | You may need to record a private access easement for the owner of Block 14 Lot 3, as well as providing access keys. |
| 06/04/2004 | DOUG WILLIAMS | ENGINEERING | REVIEW | Approved | All previous comments have been adequately addressed, with one minor exception. Engineering Division recommends approval of the Landscape Plan, and the Development plan with the following condition: Correct the City Field Book number referenced for the basis of elevation (1989 A-1 page 20). (Previous comment #3) |
| 06/04/2004 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this DP D. Dale Kelch, EIT Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
| 06/15/2004 | CRAIG GROSS | PIMA COUNTY | WASTEWATER | Approved | TO: Kent A. Delph, Delph Engineering, Inc. THRU: FROM: ____________________________________ representing the Pima County Departments of Wastewater Management and Environmental Quality SUBJECT: Highlands Free School - Submittal D04-0010 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you wish to discuss the above comments, please contact me at the phone number provided, under my signature. Copy: Project |