Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEVELOPMENT PLAN
Permit Number - D04-0008
Review Name: DEVELOPMENT PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/15/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
03/16/2004 | JIM EGAN | COT NON-DSD | FIRE | Approved | The Development Plan is approved 03/16/04. |
03/19/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D04-0008 LOTS 3 @ WEST POINT CROSSING/DEVELOPMENT PLAN DATE: March 17, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: Label suffix to all street names on Location Map. Delete Midvale Park Road from Location Map. Correct Missouri Dr to Missouri St. on Location Map. Ghost-in Lot 6 on sheet 2. jg |
03/29/2004 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: Lot 3 @ West Point Crossing D04-0008 Tucson Electric Power Company has reviewed and approved the development plan dated March 11, 2004. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. Please submit a final set of plans including electrical load plans, to determine how TEP will serve this commercial development. If easements are required, they will be secured by separate instrument. Submit your plans a minimum of eight (8) weeks prior to requiring service. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8479 Pager: (520) 218-6565 Fax: (520) 917-8400 |
04/05/2004 | FRODRIG2 | COT NON-DSD | ENVIRONMENTAL SERVICES | Denied | Following are the items of concerns for refuse collection: * After service of the enclosure where does the truck go. As shown he can only go to the left and that takes the truck into a turn that cannot be made or directs the truck into the fast food lane of the resturant. * Question the flow of service with the container to the left as shown. * Question no provisions for recycling service. |
04/08/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DATE: April 8, 2004 To: Craig Gross Planning Administrator FROM: Loren Makus Engineering Division SUBJECT: Lot 3 @ Westpoint Crossing Development Plan D04-0008 (First Review) T15S, R13E, Section 02 RESUBMITTAL REQUIRED: Development Plan. The Engineering Section has reviewed the Development Plan (DP) for Lot 3 @ Westpoint Crossing and does not recommend approval at this time. The following review comments need to be addressed in the next submittal. Development Plan: 1. Provide boundary data including bearings and basis of bearing and distances in feet. (DS 2-05.2.3.A) 2. Show cross access easement for solid waste pickup. The two adjacent projects must provide for access to the solid waste collection vehicles. See figure 1 of Development Standard 6-01 for maneuverability diagrams. The solid waste collection vehicles require a 50-foot outside turning radius and a 36-foot inside radius. If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov. Loren Makus, EIT Senior Engineering Associate |
04/12/2004 | GLENN HICKS | COT NON-DSD | PARKS & RECREATION | Approved | DATE: April 12, 2004 TO: Ferne Rodriguez, Development Services FROM: Glenn Hicks, Parks and Recreation SUBJECT: CDRC Transmittal, D04-0008 Lot 3 @ West Point Crossing: DP CC: Craig Gross, Development Services Staff has reviewed the development plan and has no comments. Please feel free to call me at 791-4873 x 215 if you have any questions. |
04/12/2004 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
04/12/2004 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: D04-0008 Lot 3 @ West Point Crossing Development Plan TRANSMITTAL: April 12, 2004 DUE DATE: April 12, 2004 COMMENTS 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is March 15, 2005. 2. Per a conversation with Lonny Rollins, this reviewer acknowledges that an assessment of the West Point Crossing development is being made at this time. The assessment is being made in order to provide the COT Development Services Department with an accurate depiction of the as-built conditions including the new development for lots 3 and 4 and ongoing construction or development. I would also like to add that at the time of approval of the development plan on Lot 4 it was agreed by this department and the developer that prior to issuance of a building permit for the development on said lot, the requested as-built drawings would be submitted to the Development Services Department for review and archives. Upon verification and approval of the updated drawings the hold on building permits will be removed. 3. Please include in the title block a brief legal description. DS 2-05.2.1.G.2 4. Please reference all applicable subdivision, development plan case numbers in the lower right corner next to the title block of the first sheet. The reference numbers were listed on sheet two but appear to have been crossed out prior to submittal of the development plan packets. DS 2-05.2.1.K 5. Replace the words Client/Project with Owner /Developer. DS 2-05.2.2.A.1 6. Add the following to general note 3: General Merchandise DD "31", Subject to Section 3.5.9.2.A. 7. This project has been assigned the development plan case number D04-0008. Please reference the case number in the lower right corner next to the title block of all plan sheets. DS 2-05.2.2.B.2 8. Provide the lot boundary information including bearings in degrees, minutes and seconds with distances in feet and hundredths of a foot. DS 2-05.2.3.B 9. Label the width of the PAAL entrance. The minimum width for two-way traffic is 24 feet. Label as required. The retaining wall adjacent to the back-up spur must be relocated a minimum of three feet from the back-up spur curb. The radius of the back-up spur must be labeled. Per D.S. 3-05.2.2.B, a three-foot radius is required with an additional three clearance behind the curb. Label the back-up spur dimension and label the three-foot distance that must be provided between the back-up curb and the retaining wall. (The top of the retaining wall is approximately 2.06 feet higher than the top of the back-up curb.) Revise as required. DS 2-05.2.3.D.3 10. If applicable, all proposed easements must be drawn labeled and dimensioned. Indicate if the easement is private or public. DS 2-05.2.4.G 11. This plan does not demonstrate how the pedestrian circulation connects to the development to the east of lot 3. The proposed sidewalk stops short of the access ramp at the PAAL entrance. Connectivity must occur and must be demonstrated on the plan. The access ramp at the northwest corner of the building is depicted with an extruded curb and will not provide for a safe transition onto the sidewalk that would lead the pedestrian along the west side of the building. A different type of access ramp is suggested in order to comply with the maximum slope and transitions. Clarify where the sidewalk along the north side of the building will lead a pedestrian. It appears that the sidewalk stops at the northeast corner and per the drawing it does not connect to a crosswalk or existing or proposed sidewalk. Dimension the areas around the bicycle parking locations on the site plan or depict the conditions with dimensions on the bicycle parking detail drawings. Also, indicate the type of lighting for security proposed for the bicycle parking areas. DS 2-05.2.4.K and DS 2-05.2.4.Q 12. At least one handicapped vehicle parking space is required for this project. Per the plan two handicapped spaces have been provided. One of the spaces must be a van accessible space with an eight (8) foot wide access aisle. Per the plan the access aisle appears to be five (5) feet wide. Please revise the plan and detail drawing as required. DS 2-05.2.4.P 13. If applicable indicate the type of postal service proposed, freestanding pedestal, inside delivery etc. draw and add keynote based on the proposed type. DS 2-05.2.4.V 14. If applicable. Draw and label all proposed freestanding signage on the site. DS 2-05.2.4.W 15. A hold on the issuance of building permits on Lot 3 as has been placed on Lot 4 will placed until the as built drawings which should include all on going development and proposed development on lot 3 and 4. See related comment 2. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\planning\cdrc\developmentplan\D040008dp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan and landscape plans and additional requested documents |
04/13/2004 | JIM STOYANOFF | COT NON-DSD | REAL ESTATE | Approved | No comment. |
04/15/2004 | TIM ROWE | PIMA COUNTY | WASTEWATER | Denied | April 1, 2004 TO: Lonny Rollins, P.E. Stantec Consulting THRU: Craig Gross City of Tucson Development Services Department FROM: Dickie Fernández, E.I.T. Development Review Division (Wastewater) SUBJECT: Sprint Bldg Lot 3 at West Point Crossing Development Plan - 1st Submittal D04-0008 The above-referenced project has been reviewed on behalf of the Pima County Wastewater Management Department. The following comments are offered for your use: 1. This project will be tributary to the Roger Road Wastewater Treatment Facility via the Santa Cruz Interceptor. Provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. Contact Robert Decker, PCWWM Planning Services, at (520) 740-6625 regarding this matter. 2. ALL SHEETS. Add the project number, D04-0008, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers. 3. SHEET 1. Add project reference numbers S99-054, CD9-90-17, C9-90-17 and C9-78-54 to the title block. 4. SHEET 1. Based on our evaluation, this project would qualify for Non-Participating sewer connection fee rates. 5. SHEET 1. Include the number of proposed fixture units. Based on this number a Sewer Service Agreement may be required. 6. SHEET 1. Show a symbol for existing sewers within the legend. 7. SHEET 1. Show a symbol for proposed sewers that reads "PROPOSED 4" PRIVATE SANITARY SEWER" within the legend. 8. SHEET 2. Revise keynote 26 to read "PROPOSED 4" SANITARY SEWER". 9. SHEET 2. Label the existing sewer with the appropriate Pima County plan number. 10. A complete set of revised bluelines, and a response letter, addressing these comments is required. Additional comments may be made during the review of these documents. The next submittal of this project will be the 2nd submittal. The review fee is $50.00 per revised sheet for the second submittal. The second submittal will include 2 revised sheets and a check for $100.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter. If the number of revised sheets changes, please adjust the review fee accordingly. If you wish to discuss the above comments, please contact me at 740-6947. Dickie Fernández, E.I.T. Development Review Division (Wastewater) Copy: Project DF/df |
04/15/2004 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Denied | Similar comments from the prior submittal for Lot 4; (actually the same ones) - is there any documentaion on file stating the affect on the interchange in the peak hours (it's bad already, this won't help) - is there any mitigation to prevent an unacceptable level of service - is there a TIA on file, ADOT would like to review it Thank You. TM. |
04/15/2004 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Denied | DEPARTMENT OF URBAN PLANNING AND DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D04-0008 Lot 3 @ West Point Crossing 04/15/04 ( ) Tentative Plat ( x ) Development Plan ( x ) Landscape Plan ( ) Revised Plan/Plat ( ) Board of Adjustment ( ) Other CROSS REFERENCE: C9-90-17 NEIGHBORHOOD PLAN: Santa Cruz Area Plan GATEWAY/SCENIC ROUTE: N/A COMMENTS DUE BY: April 12, 2004 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: ( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment ( ) Proposal Complies with Annexation or Rezoning Conditions ( ) RCP Proposal Complies With Plan Policies ( x ) See Additional Comments Attached ( ) No Additional Comments - Complies With Planning Comments Submitted on: ( x ) Resubmittal Required: ( ) Tentative Plat ( x ) Development Plan ( x ) Landscape Plan ( ) Other REVIEWER: E. Anderson 791-4505 DATE: 04/06/04 DEPARTMENT OF URBAN PLANNING AND DESIGN COMMENTS LOT 3 @ WESTPOINT CROSSING, D04-0008 1. Please continue the pedestrian access lane from Lot 4, located west of the subject property, along the southern portion of the subject property to the pedestrian access lane on the property to the east. |
04/15/2004 | CRAIG GROSS | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | |
04/16/2004 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this DP D. Dale Kelch, EIT Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |