Permit Number: D03-0042
Parcel: 13216647A

Review Status: Completed

Review Details: RESUBMITTAL - DEVELOPMENT PLAN

Permit Number - D03-0042
Review Name: RESUBMITTAL - DEVELOPMENT PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/05/2004 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/08/2004 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: FEDERAL EXPRESS PARKING LOT
D03-0042

Tucson Electric Power Company has reviewed and approved the development plan
dated March 1, 2004.

Please submit a final set of plans including electrical load plans, to
determine how TEP will serve this commercial development. If easements are
required, they will be secured by separate instrument.

Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8479
Pager: (520) 218-6565
Fax: (520) 917-8400
03/17/2004 DOUG WILLIAMS ENGINEERING REVIEW Approv-Cond APPROVED WITH THE CONDITION THAT THE SIDEWALK AT THE EASTERN PORTION OF THE SITE ADJACENT TO MACARTHUR CIRCLE BE REVISED TO OMIT THE TWO RIGHT ANGLES DEPICTED
03/25/2004 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond 1) Revise the plans to provide a street landscape border along the entire Macarthur Circle street frontage, except for ingress/egress locations. The maximum driveway width allowed at the property line is 30 feet per TCC Sec.25-40(a).

2) Revise or omit the landscape and screening calculations on sheet DP.1. The notes are not correct and are inconsistent with the landscape plan.