Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - DEVELOPMENT PLAN
Permit Number - D03-0042
Review Name: RESUBMITTAL - DEVELOPMENT PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
01/16/2004 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Passed | Wastewater Not Required. |
01/16/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D03-0042 FEDERAL EXPRESS PARKING LOT/REVISED DEVELOPMENT PLAN DATE: January 16, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. 1. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2. All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. |
01/20/2004 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | TO: Craig Gross, CDRC SUBJECT: Federal Express Parking Lot REVIEWER: Doug Williams DATE: January 20, 2004 ACTIVITY NUMBER: D03-0042 T14S, R14E, Section 11 Resubmittals Required: Development Plan / Hydrologic and Hydraulic Report SUMMARY: Engineering Division has reviewed the Development Plan, Landscape Plan and Hydrologic and Hydraulic Report received on 12 January 2004. Approvals are not recommended at this time. The following comments are offered: HYDROLOGIC AND HYDRAULIC REPORT: Previous comments (1-3 below) have not been fully addressed in the report. 1. Please provide retention basin percolation test results upon completion of testing. Test procedures shall be performed in accordance with the recommended procedure of the Pima County Department of Transportation - Flood Control District; 2. Specify the name, address, and telephone number of the person(s), firm(s), agency or agencies responsible for the ownership, operation, scheduled and unscheduled maintenance, and liability of the drainage improvements and detention/retention basins, described in the drainage report, (SMDDFM, Section 2.3.1.2 E); 3. Provide a detailed Detention/Retention basin maintenance checklist and schedule, and basin performance criteria for annual and as-needed inspections of the basins and drainageways, addressing the items specified in the SMDDFM (sections 2.3.1.6 C 1& 2 and 14.3); 4. Please correct the reference to "ref 6" and revise the language describing basin and drainage improvement responsibilities lying with a homeowners association in the "Maintenance" section (page 4). DEVELOPMENT PLAN: 1. Depict sidewalk scuppers, fully labeled and dimensioned, for conveyance of 100% of 10-year flows under sidewalk areas (DS 2-08.5.1 E and 3-01.4.4 F); 2. The proposed pedestrian path in the eastern portion of the site appears to be located within an existing vehicular use area. Please demonstrate how this path will not interfere with existing vehicular circulation. The pedestrian path must be physically separated from the PAAL by providing either a raised concrete sidewalk or post barricades at intervals specified in the Pima County/City of Tucson Standard Details for Public Improvements - standard details 106 and 107. For additional information regarding sidewalk location requirements, please refer to Development Standard 2-08.4.1. GENERAL COMMENTS: The Development Plan and Drainage Report were reviewed for Development Plan purposes only. A grading plan/permit application will be required with appropriate Stormwater Pollution Prevention Plan (SWPPP) submittal documents prior to grading of the site. The grading permit should be accompanied by 3 sets of SWPPP's with text, addressing stormwater controls for all areas affected by construction activities related to this project. For further information, visit www.adeq.state.az.us/environ/water/permits/stormwater.html. Resubmittal will require a revised Development Plan and Hydrologic and Hydraulic Report addressing the comments provided above. If you have any questions, I can be reached at 791-5550, extension 1189 or Dwillia1@ci.tucson.az.us. Douglas Williams Sr. Engineering Associate Engineering Division Development Services Department |
01/20/2004 | DAN CASTRO | ZONING | REVIEW | Approv-Cond | The Zoning Review Section approves the development plan for this project, subject to the following changes on the sign-off copies. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development plan to verify that those changes do not affect any zoning requirements. 1. Please list the proposed use as follows: Parking Lot/ Commercial Storage subject to LUC Section 3.5.10.1. 2. Dimension the location of the future curb from future right-of-way. If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608. |
01/26/2004 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this DP. D. Dale Kelch, EIT Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dkelch1@ci.tucson.az.us |
01/26/2004 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: FEDERAL EXPRESS PARKING LOT D03-0042 Tucson Electric Power Company (TEP) has reviewed the plans dated October 10, 2003. TEP is unable to approve the plans at this time. There are existing electrical facilities within the boundaries of this project. In order for TEP to approve the plans, the facilities and correct easement recording information must be depicted on the plans. Enclosed are copies of a the correct easement information. Please resubmit two revised bluelines to the City of Tucson for TEP's review. You may contact me at (520) 884-3879 if you have any questions. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8479 Pager: (520) 218-6565 Fax: (520) 917-8400 |
01/27/2004 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) Include the legal description for parcel on the landscape plan. Use the same legal description on the development and landscape plans. DS 2-07.2.1.B 2) A street landscape border is required along MacArthur Circle and Park Avenue. The existing asphalt and parking areas are not exempt from this requirement. LUC 3.7.2.4. 3) Plans submitted should be folded to 8.5" x 11". Refer to DS 2-05 Exhibit 1 INSTRUCTIONS FOR FOLDING TO AN 8½" X 11" FORMAT. |