Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - DEVELOPMENT PLAN
Permit Number - D03-0041
Review Name: RESUBMITTAL - DEVELOPMENT PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/16/2003 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
12/17/2003 | JIM EGAN | COT NON-DSD | FIRE | Approved | The Development Plan is approved 12/17/03. |
12/18/2003 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D03-0041 PANTANO/22ND STORAGE EXPANSION/REVISED DEVELOPMENT PLAN DATE: December 18, 2003 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: Approved with the condition that storage buildings are numbered numerically on mylar. 1. Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2. All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. |
12/19/2003 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this D.P. D. Dale Kelch, EIT Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dkelch1@ci.tucson.az.us |
12/24/2003 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approv-Cond | COMPREHENSIVE PLANNING TASK FORCE COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT D03-0041 Pantano/22nd Storage Expansion 12/23/03 ( ) Tentative Plat (ü) Development Plan (ü) Landscape Plan ( ) Revised Plan/Plat ( ) Board of Adjustment ( ) Other (grading plan) CROSS REFERENCE: C9-85-95 NEIGHBORHOOD PLAN: General Plan GATEWAY/SCENIC ROUTE: N/A COMMENTS DUE BY: December 29, 2003 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: ( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment ( ) Proposal Complies with Annexation or Rezoning Conditions ( ) RCP Proposal Complies With Plan Policies (ü) See Additional Comments Attached ( ) No Additional Comments - Complies With Planning Comments Submitted on: November 13, 2003 (ü)) Resubmittal Required: ( ) Tentative Plat ( ) Development Plan ( ) Landscape Plan (ü) Other (Compliance Letter) REVIEWER: K. Aragonez 791-4505 DATE: December 23, 2003 1. Please provide a compliance letter from Walter Tellez, Zoning Administrator, which acknowledges that the plan being submitted comes under the use of commercial storage. A copy of this letter is required for us to keep on file as part of your review. Be aware that outdoor storage is required to comply with Land Use Code Section 3.5.10.1 and 3.5.5.1.H as it relates to this site. Should compliance with this section or with the Zoning Administrator be required, resubmittal of a development plan will be necessary. |
12/29/2003 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
12/29/2003 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Michael St.Paul FOR: Patricia Gehlen Planning Technician Principal Planner PROJECT: D03-041 Pantano/22nd Street Commercial Storage 2nd Review TRANSMITTAL: December 29, 2003 DUE DATE: December 29, 2003 COMMENTS CODE SECTION/ DEVELOPMENT STANDARD 1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is October 20, 2004. 2. Please provide a compliance letter from Walter Tellez, Zoning Administrator, which acknowledges that the plan being submitted is consistent with the use of commercial storage as required by the rezoning conditions and the Park Industrial Zone. If the design of this development plan is designated commercial storage than it must comply with the subject to requirements of the Land Use Code, Sections 3.5.10.1 and 3.5.5.1.H. for outdoor storage. These subject to requirements must also be identified in the general notes. Outdoor storage is limited to twenty-five percent (25%) of the site area. Please provide calculations demonstrating compliance with the maximum outdoor storage area. Storage materials shall not be visible from outside the screen wall along the northeast property line adjacent the Pantano Wash (SR Zone), nor shall materials stored within fifty feet (50') of the northeast property line exceed the height of the screen wall. Delineate the restrictive area on the site plan with a note stating the limitations of the area. LUC Sec 3.4.10.1, & 3.5.5.1.H 3. Provide the site address on the development plan. As there is no management on site, please provide the address of the off-site management address. You should also change the name of the project from "Pantano / 22nd Storage Expansion" to something more appropriate to an independent site. 4. The on site pedestrian circulation on the site plan is incomplete. A continuous pedestrian circulation path is required with access to the public right-of-way. The pedestrian circulation path also performs as the pedestrian refuge area which must be maintained between any enclose structure and the PAAL and must be a minimum of five feet (5'). This may require a relocation of the loading zone on the east side of the enclosed building. DS 2-08.3.1 LUC Sec 3.2.8.3.B DS 3-05.2.2.B.1 5. Provide fully dimensioned details for the off-street bicycle parking locations. Include the materials for lighting, paving, types of security, dimensions, the specific type of rack and the number of bicycles it supports. Bicycle parking must be separated from the vehicle access areas. DS 2-05.2.4.Q |
12/29/2003 | GLENN HICKS | COT NON-DSD | PARKS & RECREATION | Approv-Cond | DATE: December 29, 2003 TO: Ferne Rodriguez, Development Services FROM: Glenn Hicks, Parks and Recreation SUBJECT: CDRC Transmittal, Project D03-0041 Pantano/22nd Storage Expansion: RDP CC: Craig Gross, Development Services Staff has reviewed the development plan and has the following comments: The development plan resubmitted on 12/29/03 showing a 30 ft corridor to be dedicated to the City of Tucson or Pima County for the Pantano River Park is approved. Approval is also based on the letter of understanding received from Mr. M. Chris Monson, dated 12/24/03, that states Mr. Monson is willing to cooperate with the City and County to provide a connecting trail link for the Pantano River Park across the existing storage facility to the north at 1351 S. Eastside Loop. Please feel free to call me at 791-4873 x 215 if you have any questions. |