Permit Number: D03-0038
Parcel: 14113017A

Address: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - DEVELOPMENT PLAN

Permit Number - D03-0038
Review Name: RESUBMITTAL - DEVELOPMENT PLAN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/18/2003 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
11/25/2003 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: D03-0038 RITA RANCH MEDICAL CENTER/REVISED DEVELOPMENT PLAN
DATE: November 24, 2003



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

Delete letters and number each building numerically.
















jg
11/28/2003 PETER MCLAUGHLIN ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Peter McLaughlin
Senior Planner

FOR: Patricia Gehlen
Principal Planner

PROJECT:
D03-038
Rita Ranch Medical Center

TRANSMITTAL: November 28, 2003
DUE DATE: December 1, 2003


1. Add the development plan number (D03-038) to each sheet of the NPPO/ landscape plan, in the lower right hand corner near the title block.
DS 2-05.2.1.K

2. The street perimeter yard building setback along Rita Road (MS&R) is required to be the greater of 21 feet or the height of exterior building wall measured from back of existing/future curb location. Revise setback line on drawing to be dimensioned from back of future curb instead of from the property line, and revise the setback data to specify that the 21' or height of structure MS&R setback is measured from back of existing/future curb.
DS 2-05.2.4.F & .L
LUC 3.2.6.5

3. Although a handicap access aisle is shown to be located adjacent to the handicap parking space in the detail, no handicap access aisles are indicated on the d.p. drawing. The required handicap access aisle may not be counted as a parking space. Please revise drawing to show all h/c parking access aisles and revise parking calculations for phase #1 (and for phase if necessary).
ANS/ IBC

If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
12/01/2003 LOREN MAKUS ENGINEERING REVIEW Approved
12/01/2003 JOE LINVILLE LANDSCAPE REVIEW Approved Include inventory, transplant, and mitigation notes (present in the first submittal) on the Native Plant Preservation Plan submitted for formal approval.
12/02/2003 DALE KELCH COT NON-DSD TRAFFIC Approved Traffic Engineering REJECTS this DP:

1. The symbol used for signs is incorrect. The sign symbol that these plans depict is for existing signs. Use the correct symbol for new signs IAW SDPI SD100.

2. The dimensions of the SVT's is incorrect. Rita Road is listed as an arterial roadway in the MSPR.



D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dkelch1@ci.tucson.az.us
12/02/2003 CRAIG GROSS PIMA COUNTY WASTEWATER Approved PIMA COUNTY
DEVELOPMENT SERVICES DEPARTMENT
DEVELOPMENT REVIEW DIVISION
201 N. Stone Avenue, 2nd Floor
Tucson, Arizona 85701-1207

CARMINE DEBONIS, JR. Phone: (520) 740-6586
Director FAX: (520) 740-6380
December 12, 2003

TO: Albert Suarez, R. S. Engineering Consulting Engineers

THRU: Craig Gross, City of Tucson Development Services

FROM: Tim Rowe, P.E., Development Review Engineer
(representing Wastewater and Environmental Quality)
Pima County Development Review Division

SUBJECT: Tucson Medical Center at Rita Ranch
Development Plan - 1st Submittal
D03-0038



The proposed sewers to serve the above-referenced project have been reviewed on behalf of the Pima County Wastewater Management (PCWWM) Department, and the Pima County Department of Environmental Quality (PDEQ). The following comments are offered for your use:

1. This project will be tributary to the Roger Road Wastewater Treatment Facility via the Santa Cruz - East Interceptor. Per PCWWM Planning Services, there is currently treatment and conveyance system capacity in the existing downstream sewerage system for this development. This response is not to be construed as a commitment for treatment or conveyance capacity allocation, but rather an analysis of the existing sewerage system as of this date.

2. Based on this property being located within Rita Ranch, this project would qualify for Participating sewer connection fee rates.

3. Sheet 1: Add a General Note that states

THE TOTAL NUMBER OF EXISTING AND PROPOSED WASTEWATER FIXTURE UNIT EQUIVALENTS FOR THIS PROJECT IS .

(with the blank appropriately filled in per Table 13.20.040(F)(1) in Pima County Code 13.20.040(F).)

4. Sheet 1: Sheet 1: Add a General Note that states

A PROJECT CONSTRUCTION PERMIT MUST BE SECURED FROM PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT BEFORE BEGINNING ANY WORK ON THIS PROJECT.

5. Sheet 1: Add a General Note that states

CONSTRUCTION AUTHORIZATION FROM THE PIMA COUNTY DEPARTMENT OF ENVIRONMENTAL QUALITY IS REQUIRED BEFORE BEGINNING ANY WORK ON THIS PROJECT. APPROVAL OF THIS DEVELOPMENT PLAN DOES NOT CONSTITUTE CONSTRUCTION AUTHORIZATION.

6. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced development plan. The required revision(s) may be shown on the Mylars. Please provide this office with a copy of the revised bluelines for our records. The transmittal slip for the revised bluelines should indicate: FOR RECORD KEEPING PURPOSES ONLY. NOT FOR REVIEW.

Please note the following: Approval of the above project does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.

If you wish to discuss the above comments, please contact me at 740-6563.




Tim Rowe, P.E., Development Review Engineer (Wastewater)
Pima County Development Review Division

TR/tr
Copy: Project