Review Date Reviewer's Name Type of Review Description Status Comments
01/13/2003 FERNE RODRIGUEZ START INITIALIZE THE WORKFLOW Completed
01/13/2003 TIM ROWE PIMA COUNTY WASTEWATER Denied PIMA COUNTY
DEVELOPMENT SERVICES DEPARTMENT
DEVELOPMENT REVIEW DIVISION
201 N. Stone Avenue, 2nd Floor
Tucson, Arizona 85701-1207

CARMINE DEBONIS, JR. Phone: (520) 740-6586
Director FAX: (520) 740-6380
February 27, 2003

TO: Bruce Paton, Rick Engineering

THRU: Craig Gross, City of Tucson Development Services

FROM: Tim Rowe, P.E., Development Review Engineer (Wastewater)
Pima County Development Review Division

SUBJECT: Eastpointe Commercial Center, Lots 1-5
Development Plan - 1st Submittal
D03-0002



We have reviewed the above-referenced project on behalf of the Pima County Wastewater Management Department. The following comments are offered for your use:

1. There is currently capacity in the existing downstream sewerage system for this development. This response is not to be construed as a commitment for conveyance capacity allocation, but rather an analysis of the existing sewerage system as of this date.

2. Based on the Sewer Service Agreement for Eastpointe Commercial Center, Lots 1-5 (S99-036), this project would qualify for Non-Participating sewer connection fee rates.

3. Add the development plan case number, D03-0002, to the title block of each sheet. This number should be shown larger or bolder than the cross reference numbers.

4. Sheet 1: Revise General Note 11 to read,

ON-SITE SANITARY SEWERS WILL BE PUBLIC AND WILL BE DESIGNED AND CONSTRUCTED TO PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT STANDARDS AND MUST BE ACCEPTED AND RELEASED FOR SERVICE BY PIMA COUNTY WASTEWATER MANAGEMENT PRIOR TO THE ISSUANCE OF SEWER CONNECTION PERMITS.

While the 6" HCS sewer lines will be private sewer lines, the intent of the required General Notes is to show whether the sewer "spines" or "trunks" are public or private.
5. Sheet 1: Delete General Note 12. This general note should be used only when more than 400' of off-site public line is being proposed.

6. Sheet 2: Each of the proposed 6" HCS lines must connect to the proposed 8" public sewer line at a manhole, or at a manufactured wye or tee installed in the public sewer line at the time of original construction.

7. Sheet 2: Show the existing sewer lines in the Houghton Road right of way (using the symbols and linetypes shown in the legend for existing sewers), including the size and plan number of the existing sewer line

Note: A new sewer line (G-2002-044) is being constructed in the Houghton Road right-of-way to provide public sewer service to the Walgreen’s which will be, or has been, built at the northeast corner of Houghton & Broadway. Manhole #1 in his new sewer line may be a suitable point of connection to the public sewer system. This new sewer line does not yet appear on PCWWM’s base or section maps, but the approved plans for this sewer line may be seen in our offices.

8. Sheet 2: Show where the proposed public sewers will connect to the existing public sewer system, including the manhole number, rim elevation and invert elevation of the new or existing manhole that will serve as the point of connection.

9. Sheet 2: Two parallel sets of proposed sewer lines have been shown. Delete the set of proposed sewer lines shown in that portion of the existing public sewer easement (Bk 52, Pg. 100, M&P) that will be released by separate instrument per Keynote18.

10. Sheet 2: Number each proposed new public manhole, with NEW MH #1 being the new manhole with the lowest invert elevation, NEW MH #2 being the next upstream manhole, etc.

11. Sheet 2: Revise the manhole invert elevations as necessary to provide the slopes required by PCWWM’s manual of Engineering Standards and Procedures.

12. Sheets 2 & 4: The manholes in the proposed new sewer line must not collect and discharge excessive amounts of rainwater runoff into the public sewer system. The manhole north of Building 2 appears to be in the rainwater runoff channel. Revise, or show that this manhole will be equipped with a watertight cover.

13. Sheet 2: Show the length and slope of all the proposed 8" public sewer lines.

14. Sheet 2: Show an appropriate, proposed public sewer easement by separate instrument over the entire length of the proposed public sewer lines. This easement may not dead end on the property. PCWWM’s sewer maintenance vehicles must be able to enter the site, service all of the manholes in the public sewer lines, and exit the site without driving outside of the proposed easement.

15. Sheet 2: The 6" HCS lines serving Lots 1, 4, 5A & 5B extend onto other lots, and are either wholly, or partially, located outside the boundaries of the existing cross access easement. Provide private easements, joint use agreements, or other mechanisms as necessary for the owners of these lots to access the entire length of their HCS lines for maintenance, repair or replacement.

16. Begin the public sewer easement release process as soon as possible. Building permits for the structures shown within the easement being released, typically cannot be issued until after the release is complete.

17. We will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

If you wish to discuss the above comments, please contact me at 740-6563.




Tim Rowe, P.E., Development Review Engineer (Wastewater)
Pima County Development Review Division


TR/tr

Copy: Project
01/14/2003 JIM EGAN COT NON-DSD FIRE Approved The Development Plan is approved 1/14/03.
01/28/2003 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved NO COMMENT
S03-002
STEVE CHASE
ALDEA TEJIDO
01/30/2003 PAUL MACHADO DEVELOPMENT SERVICES ENGINEERING Denied To: Craig Gross
Zoning Administrator
SUBJECT: East Pointe Commercial Center
Development Plan D03-0002 (First Review)
T14S, R15E, Section 11

RESUBMITTAL REQUIRED: Development Plan and Drainage Report.

The Development Plan (DP) and Drainage Report (DR) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Development Plan:

1. AzNPDES requirements apply for all developments over 5 acres. Contact Loren Mekas for submittal requirements at (520) 791-5550.
2. A separate grading permit will be required and a reseeding bond of $12,325.00.
3. Please provide property description per D.S. 2-02.2.1.3.
4. Provide all existing and proposed buildings and structures, including location, size, height, overhangs, canopies, and use per D.S. 2-02.2.1.6.
5. Label existing and future sight visibility triangles per D.S. 2-02.2.1.10.
6. Please label all vehicular (refuse container for lot 5A), bicycle, pedestrian, and handicapped circulation clearly identified per D.S. 2-02.2.1.12.
7. Fully dimensioned loading space(s) and maneuvering area (refuse container for lot 5A) per D.S. 2-02.2.1.14.
8. Please list estimated cut & fill quantities per D.S. 2-02.2.1.17.
9. Reposition proposed S/W per MS&R future curb locations.
10. All easement of record must be graphically shown on the plan together with recording docket and page per D.S. 2-02.2.1.20.
11. Please call out type of proposed curb on the DP and also in the cross sections.
12. Show and call out the sidewalk scupper for D2-C on the development plan (4-type 2 scuppers). Also call out the COT/SD number for all scuppers.
13. The depressed curb for the basin inlet for D2-C on the development plan does not match the Drainage Report. Please revise.
14. The depressed curb for the basin inlet for D2-D on the development plan does not match the Drainage Report and the (6) 1' depressed curbs @ 8' o.c. are not called out either. Please revise.
15. Revise the rip-rap to reflect the (4) 1' depressed curbs @ 20' o.c. in lieu of the 4' depressed curb at the parking at the NW portion of the project.
16. Show and call out the sidewalk scupper for D2-E on the development plan (1-type 2 scuppers). Also call out the COT/SD number.
17. The key note on the development plan for the 2' depressed curb opening for Basin D3 is mislabeled. Please revise.
18. Show and call out the depressed curb/weir openings for the basins on the development plan.
19. A security barrier is required at the inlet control structure F/2 per Stormwater det./ret. manual Chapter 3, 3.6.2.
20. Dimension from street monument lines to existing and proposed curbs, sidewalks, driveways, and utility lines per D.S. 2-02.2.1.21.
21. Show all fences, walls (N. side of prop.), or vegetation for screening and sight visibility by type, material, height, location and spacing per D.S. 2-02.2.1.27.
22. Please show Development plan number (D03-0002) on all sheets per D.S. 2-02.2.1.29.
23. A refuse container for lot 5A is required. Please show location, size, and access thereto fully dimensioned per D.S. 2-02.2.1.32 and D.S. 6-01.0.
24. Please provide adjacent property grades for review in accordance with in 2000 IBC section 13 concerning fills.
25. A private improvement agreement may be necessary for any work performed within the Right-of-way. Contact Department of transportation at (520) 791-4249 for permit information.
26. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed will suffice.
27. Clarify and provide maneuverability for the design vehicle per key note 16 and per rezoning condition 6. It seems that because of the turning radius that is used in this design, it will encroach into the on coming traffic. Please Address.
28. Add note: "Depress all landscaped areas 6" maximum for water harvesting".

Drainage Report:
1. There are three locations on both the Drainage map and Development plan and only two calculations for the sidewalk scuppers. Please revise.
2. Considering the time of concentration, please revise the Qout amount for the discharge into the existing 24" srp.
3. The discharge velocity from the 24" srp warrants scour protection. Please address.
4. Please provide a copy of the previously approved drainage report and the development plan.
5. Please show the project address on the cover of the Drainage report.
6. A drainage area in the SW area of bldg. 6 and a portion of the drive through lane for that bldg. has not been accounted for. Please revise all affected portion of the drainage report and the drainage map.
7. Include the s/w outlet scupper calculations for det/ret basin D2.
8. When resubmitting drainage report, please use a larger binder. The report is coming apart.

If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us
Paul Machado
Senior Engineering Associate,
02/06/2003 ZELIN CANCHOLA COT NON-DSD TRAFFIC Denied Traffic Engineering does not recommend approval of this DP

1. The section line for B/3 has the flag pointing the opposite direction of the way the section is drawn.
2. Section A is confusing. There are no section lines depicted on sheet 2. The section is denoted as typical but there are PAALs on sheet 2 that are not labeled as to PAAL width that do not fit the typical section depicted. Recommendation: eliminate section A and label all PAALs individually.
3. Rezoning condition 9 is duplicated on sheet 3.
4. Rezoning condition 6 states that this center shall be utilized as a Sun Tran turn around. Depict on sheet 2 the proposed path of the bus through the center.

D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dkelch1@ci.tucson.az.us
02/06/2003 KAY MARKS PIMA COUNTY ADDRESSING Denied PIMA COUNTY
DEVELOPMENT SERVICES DEPARTMENT
201 N. Stone Ave, 1st Floor
Tucson, Arizona 85701-1207

KAY MARKS
ADDRESSING OFFICIAL

PH: 740-6480
FAX #: 740-6370


TO : CITY PLANNING
FROM : KAY MARKS, ADDRESSING OFFICIAL
SUBJECT : D03-002 EASTPOINTE COMMERCIAL CENTER / REVISED DEVELOPMENT PLAN
DATE : February 3, 2003




The above referenced project has been reviewed by this Division for all matters pertaining to street naming/ addressing, and the following matters must be resolved prior to our approval:


1: Either provide copy of recorded deed for lot split of lot 5 or delete indication of lot 5A & 5B and label
lot 5.
02/06/2003 FRODRIG2 OTHER AGENCIES PIMA ASSN OF GOVTS Approved Transportation Information for Subdivision and Development Pima Association of Governments
Review Requests
Transportation Planning Division

CASE #: D03-0002 177 N. Church Avenue, Suite 405

NAME: Eastpointe Commercial Center Tucson, AZ 85701
Phone: (520) 792-1093
DATE: 2/3/2003
STREET NUMBER 1
Nearest Existing or Planned Major Street Houghton Rd (Speedway to Broadway)
Is improvement planned as part of the 5-Year Transportation
Improvement Program? Yes
Year: 2003
Planned Action: Corridor Study
Existing Daily Volume – Based on Average Daily Traffic 14,300
Existing Daily Capacity- Level of Service “E” 24,500 Existing Number of Lanes: 2
Future Daily Volume - Adopted Plan System Completed 24,217
Future Daily Capacity - Level of Service “E” 42,000 Future Number of Lanes: 4
Estimated Traffic Generation for Proposed Development 1,238
(Expressed in Average 24 Hr. Vehicle Trips)
Present Bus Service (Route, Frequency, Distance) None
Existing or Planned Bikeway Bike route with striped shoulder
Remarks:
STREET NUMBER 2
Nearest Existing or Planned Major Street
Is improvement planned as part of the 5-Year Transportation
Improvement Program? No
Year:
Planned
Existing Daily Volume – Based on Average Daily Traffic 0
Existing Daily Capacity- Level of Service “E” 0 Existing Number of Lanes: 0
Future Daily Volume - Adopted Plan System Completed 0
Future Daily Capacity - Level of Service “E” 0 Future Number of Lanes: 0
Present Bus Service (Route, Frequency, Distance)
Existing or Planned Bikeway
Remarks:
02/10/2003 FRODRIG2 DEVELOPMENT SERVICES ZONING Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera FOR: Patricia Gehlen
Senior Planner Principal Planner

PROJECT:
D03-002
Eastpointe Commercial Center, Lots 1-5
Development Plan
TRANSMITTAL: February 4, 2003
DUE DATE: February 10, 2003


COMMENTS
1. Section 5.3.8.2, LUC, permits a maximum of one year from the date of application to obtain approval of a development plan. If, at the end of that time, the development plan has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this development plan is January 13, 2004.

2. The plan has changed somewhat from the original concept/development plan. As of this review the Zoning Review Section will review the proposed changes as if the change of concept/development plan is minor and does not require Mayor and Council approval. If it is deemed necessary by the Rezoning Section that the changes are major and requires Mayor and Council approval, subsequent reviews may mandate additional comments.

3. In addition to the book and page description in the title block, add the brief legal description as noted in the previous plan, “Being a portion of the southeast…”.
DS 2-05.2.1.G.2

4. Add to general note three (3) the subject to section 3.5.9.2.C.
DS 2-05.2.2.B.1

5. This site is subject to the following overlay zones, Major Streets and Routes Setback Zone (MS&R); Sec. 2.8.4, and Scenic Corridor Overlay Zone SCZ; Sec. 2.8.3. Add a note for each overlay zone under the general note's text block that this site is designed to meet the criteria of the MS&R and SCZ overlay zones. The note should specify which lots are affected by the overlay zone criteria.
DS 2-05.2.2.B.10

6. Add the docket and page numbers for all proposed easements or portions of easements that are to be vacated. The docket and page numbers must be on the Mylar copy that will be submitted for stamps and signatures.
DS 2-05.2.2.3.B

7. Dimension all PAAL widths, all drive-through lanes, as well as any proposed escape lanes within the drive-through service area. A. Indicate the direction of vehicular travel through the drive-through lanes. B. The minimum stacking capacity for one drive-through lane is six spaces 18 feet long each. C. Demonstrate the required stacking capacity for the restaurant on pad 2. D. Indicate the number of proposed drive-through lanes for the bank. Demonstrate the required stacking capacity for each drive-through lane for the bank. Depict the drive-through lanes and escape lanes. G. The loading zone for the bank use may not be placed within a PAAL. Demonstrate maneuverability into and out of the loading zone when the drive-through lanes are occupied. Will the loading zone be provided with a separate PAAL to eliminate access problems? Future comments may be forthcoming on this issue based on subsequent plan submittals.
DS 2-05.2.4.D.3 and DS 2-05.2.4.0

8. Building setbacks along a Scenic Corridor are based on a 3:1 ratio. Buildings five (5) and six (6) must be setback 90 feet from the Houghton Road property line. Building four (4) must be setback 79.5 feet from the Houghton Road property line. A variance is required if the buildings are to be constructed in the locations as shown on the plan. The previous variance was only for the Shurgard Parcel, see Board of Adjustment case C10-99-55 condition 5. (The change in development plan may be significant enough that the approved board of adjustment case may be null and void.) You may contact Wayne Bogdan for information regarding the Board of Adjustment case C10-99-05.
DS 2-05.2.4.I

9. Provide a safe and continuous sidewalk from building five (5) to building six (6). All sidewalks must be a minimum of four in width. Where parking spaces abut a sidewalk and the vehicle is allowed to overhang onto the sidewalk the sidewalk must be a minimum of six and one-half (6-1/2) feet wide. Dimension all pedestrian sidewalks or add keynotes that specify the width of the sidewalks. Several locations appear to be less than required. Please revise and add dimensions or keynotes as required.
DS 2-05.2.4.K

10. Provide a response letter that states how all rezoning conditions have been addressed and meet compliance.
DS 2-05.2.4.U

11. Indicate location and type of postal service to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping.
DS 2-05.2.4.V

12. The locations of the proposed signs have been indicated but the type and size has not. Please specify on the plan the size and type. Please contact the Signs and Codes section with regards to the number and square footage per sign allowed when in a Scenic Corridor.
DS 2-05.2.4.W

13. The landscape, which was included in the packet, does not match the change of development plan. Please provide a matching landscape plan with the next development plan submittal packet. Refer to the Landscape Reviewer comments regarding landscape buffers, screen walls, scenic corridor requirements, and board of adjustment conditions as it pertains to landscaping.
DS 2-05.2.4.X

14. This site is subject to the Scenic Corridor Overlay Zone Criteria. A separate application and fee for the Scenic Corridor review is required. A cursory review of the plan for Scenic compliance was done but only for building setbacks and view corridors. The building setbacks for buildings four (4), five (5), and six (6) have not been met and the view corridors were not depicted.

The following notes must be added. These notes are relevant to the Scenic Corridor. Additional comments may be required to be listed based on the Scenic Corridor review. See LUC section 2.8.2 and 3.5.7.2. (Call me regarding the SCZ application and additional requirements that must be addressed.)

1. Provide three (3) copies of the tentative plat for SCZ review with the following items added.

2. Include in 30 foot buffer label the notation “30 foot undisturbed natural buffer to be preserved and maintained in it’s natural state”.

Add and annotate the 400-foot SCZ corridor boundary on the development plan.

4. Please add the following notes to the tentative plat.

a.) Add the view corridor calculations.

b.) Individual SCZ case not required for each lot, but site plans, elevations, and colors must be submitted for each lot for review of compliance to Scenic Corridor Zone case number SCZ-03- (assigned case number still pending) for height, colors, and setbacks.

c.) Maximum height of structures will be 1/3 the distance of the structure from the future right-of-way of Houghton Road right-of-way line, not to exceed 30 feet.

d.) No grading beyond that is necessary for siting of buildings, driveway entrances, private yards, and structural improvements. All existing vegetation with a caliper of 4 inches or greater and all saguaro cacti must be preserved or relocated on the site.

e.) Existing Drainageways are to be maintained in their natural state.

f.) All new utilities for development on private property or public right-of-way along Houghton Road will be underground. Trenching is permitted for the placement of utilities lines, if area is revegetated in accordance with Land Use Code Sec. 3.7.5.2.D

g.) Building or structure surfaces, which are visible from Houghton Road will have colors, which are, predominate within the surrounding landscape. Colors are as follows: (list approved colors from SCZ-03-____ case.)

h.) Fencing and freestanding walls facing Houghton Road will meet material restrictions in Land Use Code Sec. 3.7.3, Screening Requirements.

i.) All areas between the Houghton Road MS & R right-of-way line and the existing street right-of-way that are disturbed by development shall be revegetated with native vegetation.

j.) All disturbed areas on the site that are visible from Houghton Road and are not covered by permanent improvements shall be revegetated with native plants, plants from the Drought Tolerant Plant List, or a combination of both.

k.) Exposed cut and fill slopes shall be no greater than one (1) foot rise or fall over a three (3) foot length.

15. Demonstrate on the plan how the bus turn around will comply with rezoning condition six (6). If required contact the COT Transportation Department for information regarding the maneuverability and location of the bus turnaround.

Rezoning condition 9 has been listed twice, remove one.


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

DGR C:\planning\cdrc\developmentplan\D03002dp.doc
02/11/2003 JOE LINVILLE DEVELOPMENT SERVICES LANDSCAPE Denied Revised landscape and native plant preservation plans are required for this project. The plans submitted only addressed requirements for the two pads developed initially.

Resubmittal of the development plan, landscape plan and native plan preservation plan is required.
02/13/2003 FRODRIG2 COT NON-DSD REAL ESTATE Denied REAL ESTATE SERVICES INFORMATION AND APPLICATION FORM

TO: City of Tucson Real Estate Division
Real Estate Administrator
Post Office Box 27210
Tucson, AZ. 85726-7210

As owner(s) of the real property located at which has a tax parcel number of and which is legally described as:
the undersigned does hereby make application for:

Ž the vacation and sale of right-of-way

Ž the abandonment of the City's interest in easement(s)

Ž the City’s grant of easement(s)

Ž (other)

The specific action requested is detailed as follows: (legal descriptions, drawings, copies of vesting deeds and a title insurance policy are attached).

The proposed use of the subject property is:

This application is made subject to the following terms and conditions:
The City will circularize this request to City, County and utility company staff for comments.
The comments received in the circularization process may become conditions/requirements placed on this request, any such conditions/requirements shall be addressed by the undersigned.
The City will prepare and provide the undersigned the appropriate Release and Consent forms.
The undersigned must provide signed Release and Consents from all affected property owners.
The enclosed check/money order made payable to the City of Tucson in the amount of $200.00 is submitted as a non-refundable application fee, regardless of the final outcome of this request.
The City is not responsible for real estate commissions due any broker or agent for this request.
The undersigned has received and read the attached Application Information and understands the timelines and potential conditions/requirements associated with a request of this nature.


DATE:
Property Owner


Address


Phone

APPLICATION INFORMATION


Applications for Real Estate Services should be filed at the Real Estate Division, County-City Public Works Building, 201 N. Stone Avenue, 6th Floor, or mailed to City of Tucson, Real Estate Division, P.O. Box 27210, Tucson, Arizona 85726-7210, Attention: Real Estate Administrator.

The applicant should discuss its request with staff in the Real Estate Services Section prior to submitting an application. Preliminary ownership verification and feasibility of the request may be discussed as well as possible conditions/requirements that may be generated by the circularization of the request for comment by the appropriate agencies.

In requests for vacation of right-of-way, the applicant is required to obtain signed Release and Consents from any other affected property owner(s). Evidence of title may be required for all parcels involved in the request and a site/development plan may be requested of the applicant. Occasionally conditions require the dedication by the applicant of other right-of-way needed by the City. In such cases, the applicant must obtain all signatures needed for required dedications.

In requests for abandonment of easement, only the City’s interest can be abandoned through this process. If any other agency, including but not limited to Tucson Electric Power, Qwest Communications, Southwest Gas, Pima County Wastewater or Tucson Cablevision, have an interest in the subject easement, the applicant must pursue abandonment from each individual agency as a separate matter. Similar to the vacation of right-of-way, conditions/requirements may be made. If facilities currently exist in the easement area, abandonment is usually impossible unless applicant pays for and completes the relocation or abandonment of the occupying facilities.

In all requests for the conveyance of an interest in real property, value must be paid to the City for the property being conveyed. This value may be calculated by the City’s remnant land sale process, estimated by staff or by appraisal. The value may be in the form of a land for land exchange, paid in cash or on parcels valued over $7,500, paid to the City by three annual payments plus interest.


APPLICATION FEE

A non-refundable application fee of $200.00 is charged for processing all real estate service requests.


PROCEDURE

These procedures may vary slightly, depending upon the specific request. Generally, upon payment of application fee, the required Release and Consents will be prepared by City staff and given to the applicant. Signatures on Release and Consents are to be obtained by the applicant.

Staff may develop a sketch illustrating the requested action. The sketch and narrative explanation of the request will be circularized to appropriate City and County departments and utility companies for comment. If any of the utility companies have facilities or installations in the requested right-of-way, arrangements must be made for 1) relocation of the facilities or 2) reservation of easement(s) by the City to allow the facilities to remain in place. Note that in requests for the abandonment of the City’s interest in utility easements, the City does not contact the utility companies or Pima County, the applicant must contact those agencies directly.

The applicant will be notified of conditions/requirements placed on the proposal by the reviewing agencies. The applicant must agree to meet said conditions/requirements or, if said conditions/requirements are not acceptable, the applicant may negotiate directly with any review agency making conditions/requirements. A change of conditions/requirements must be confirmed in writing by the applicable review agency.

City staff will determine the applicable means of valuation. The in-house determination of value under the City’s remnant sales procedure may be sufficient to establish the value of the property the applicant is seeking to acquire but certain cases require a full appraisal. Approval of the Real Estate and Appraisal Review Committee is also typically required.

The remnant sales procedure is available for use in cases where sales price is less than $12,500. The procedure uses 120% of the assessed land value already established by the Pima County Assessor on a square foot basis for the adjacent property to determine a minimum sale price. Approval of the Real Estate Administrator and Director of Transportation is required. Approval of the Appraisal Review Committee is additionally required for sales between $2,501 and $12,500. On sales up to $7,500 the City Clerk records the signed Quitclaim Deed, as the City provides no title insurance for these sales. Sales above $7,500 require separate Mayor and Council approval and closing is usually through escrow at a title company. Title insurance plus one-half of the escrow fees, may be paid by the City in certain circumstances.

If staff determines a full appraisal is required, the Real Estate Division will coordinate and obtain an appraisal and a separate appraisal review by appraisers under contract with the City. The applicant shall be responsible to pay all appraisal costs up front. Staff will schedule final approval of the purchase price by the Real Estate and Appraisal Review Committee.

If the application is for the vacation and sale of street frontage, the applicant shall be responsible to obtain and record a survey of the new right of way alignment. All costs associated with the survey are to be paid by the applicant.

The City may credit the cost of the appraisal and/or the survey toward the purchase price if the proposed transaction closes escrow within one year. If the sale does not proceed to closing, the costs are non-refundable. If appraisal and/or survey costs exceed the value of the right-of-way, the difference is non-refundable.

NOTE: Where a request for the vacation and sale of right-of-way is due to an encroachment into the right-of-way, the appraisal and survey costs will not be deducted from the purchase price. The applicant may also be required to reimburse the City for staff time spent on investigation, inspection, survey of encroachment or preparation of an “estimate of value” for right-of-way to be vacated in cases of minor encroachments where a full appraisal may not be required.

A formal agreement and the conveyance documents will be prepared by City staff and provided to the applicant. Signatures on any required documents are to be obtained by the applicant. Any right-of-way dedication must be free and clear of monetary encumbrances. Once the signed documents are returned to the Real Estate Division, staff will schedule any request with a net value above $7,500 for Mayor and Council consideration.

The estimated time for completion of the above-described procedure ranges from 30 to 180 days. As previously mentioned, procedures may vary slightly depending upon the type of request and specific action required. Use this information as a guide and be prepared to provide staff with information on a timely basis to avoid additional steps and or delays.

If additional information is desired, please call the Real Estate Service Section at (520) 791-4181.
02/13/2003 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved 3950 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702
Telephone: 520-884-3879
Fax: 520-770-2002
WR#100517 February 11, 2003


Mr. Bruce Paton
Rick Engineering Company, Inc.
1745 E. River Road, Suite 101
Tucson, Arizona 58718

Dear Mr. Paton:

SUBJECT: Eastpointe Commercial Center
D03-0002

Tucson Electric Power Company has reviewed and approved the Development Plan dated January 7, 2003. It appears that there are no existing facilities or conflicts within the boundaries of this proposed development.

Please be aware that the existing electrical facilities within Broadway Boulevard actually exist northerly from where they are shown on the Plan, approximately five (5) feet south of the southerly property line of the proposed project. There are underground lines in the westerly entranceway, and east of the easterly entranceway. Please bluestake for existing facilities prior to any excavation.

Please submit a final set of plans including electrical load plans, to determine how TEP will serve this commercial development. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Greg Carter
Distribution Services – DS101
Tucson Electric Power Company
P. O. Box 711
Tucson, AZ 85702

Please call me at (520) 884-3879, should you have any questions.

Sincerely,


S. Glynda Rothwell
Right-of-Way Agent
Land Management

sgr
cc: Craig Gross, City of Tucson
02/13/2003 GLENN HICKS COT NON-DSD PARKS & RECREATION Denied DATE: February 12, 2003

TO: Ferne Rodriguez, Development Services

FROM: Glenn Hicks, Parks and Recreation

RE: CDRC Transmittal, Project D03-0002 Eastpointe Commercial Center


CC: Craig Gross, Development Services


Staff has reviewed the plans for the Eastpointe Commercial Center to be located at the northwest corner of Houghton Road and Broadway, and we have the following comments:

The proposed plans as submitted omit the Houghton Road Greenway. The segment of this trail corridor located along the eastern edge of the subject project needs to be properly integrated into the plans, and constructed by the developer at the time the shopping center is built

The Houghton Road Greenway shall be located within a minimum 40’ wide corridor along the eastern edge of the project, and constructed by the developer to the City/County Divided Urban Pathway standard, which consists of a 12’ paved path and a meandering 8’ DG path. No more than 50% of the Houghton Greenway shall be located within the public right-of-way for Houghton Road without the approval of the Parks and Recreation Department. The minimum 8’ meandering natural surface path shall be constructed to the following standard: 2” of stabilized DG compacted to 95% over native sub-base compacted to 95%. Native landscaping per the Divided Urban Pathway standard and irrigation shall also be provided. A copy of the Divided Urban Pathway standard is attached.

A maximum of one driveway shall be constructed to provide access to the subject project: from Houghton Road.

I am available to discuss our comments with the developer should questions arise. I can be reached at 791-4873, extension 215.
02/13/2003 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied COMPREHENSIVE PLANNING TASK FORCE COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

D03-0002 Eastpointe Commercial Center 02/10/03

() Tentative Plat
( ) Development Plan
( ) Landscape Plan
( ) Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: S99-036, C9-83-09, C10-99-55

NEIGHBORHOOD PLAN: Pantano East Area Plan

GATEWAY/SCENIC ROUTE: Houghton Road Scenic Corridor

COMMENTS DUE BY: February 10, 2003

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
( ) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
( ) Resubmittal Required:
() Tentative Plat
( ) Development Plan
( ) Landscape Plan
() Other

REVIEWER: JBeall791-4505 DATE: 2/4/03
Comprehensive Planning Task Force Comments
Eastpointe Commercial Center, D03-0002


The applicant’s request to develop the property located at the northwest corner of Houghton Road and Broadway Boulevard is subject to meeting certain rezoning and board of adjustment conditions.

Provide updated Landscape Plan that is coordinated, compatible, and consistent with the revised Development Plan.

The revised development plan does not appear to provide, to the fullest extent possible, shade along pedestrian walkways within the proposed project site. Please show on the development plan [sheet 2] and the updated landscape plan [L1.1] the placement of trees along the interior pedestrian circulation paths of the project site so as to provide shade for pedestrians to the fullest extent possible. [Rezoning Condition no. 11]

There are duplicate rezoning conditions number 9 on the revised development plan, sheet 3. Please correct to remove duplication of rezoning condition number 9.

The rezoning conditions call for trees along the West property line to be at least 24 inch box in size. The development plan and the updated landscape plan do not indicate 24 inch box trees along the west property line, with the only reference in the landscape being 15 gallon trees. Please correct and add to the language in the updated Landscape plan to explicitly read that trees along the West property line shall be at least 24 inch box in size. [Rezoning Condition no. 1.K]

The development plan does not show or indicate that pedestrian access is restricted from Eastepointe Estates to the C-1 parcel at the drainage ways. Please provide a detail and indicate on the development how and where the pedestrian access is restricted from Eastepointe Estates to the C-1 parcel at the drainage ways. [Rezoning Condition no. 8]

The development plan does not show or indicate the buffer areas that shall be fenced before grading occurs in accordance with the approved NPPO. Please show on the development plan and/or the updated landscape plan the fencing for all the buffer areas in accordance with the approved NPPO. [Rezoning Condition no. 1.F]

The development plan does not appear to show that the retention/detention areas are to be fully landscaped and include trees, as well as, provide for water harvesting techniques. Please demonstrate and show on either the updated landscape plan and/or the development plan that the retention/detention areas will be fully landscaped to include trees with water harvesting techniques include in the landscape plan. [Rezoning Conditions, no. 1. O and P]

Defer to Traffic Engineering for comments and compliance of the following rezoning conditions: 2, 4, 5, and 6.

Defer to Floodplain Engineering for comments and compliance of the following rezoning conditions: 1. G, H, I.

Defer to Tucson Police Department for comments and compliance of the following rezoning condition: 12.

Defer to Development Services for comments and compliance of the following rezoning conditions: 1. F, D, E.

Provide renderings and color palette for all buildings and signage in order to demonstrate colors used are found in the surrounding natural desert. [Rezoning Condition no. 1.K]

The development plan, sheet 3, does not provide a section detail of the proposed masonry screen walls for this project. Please provide a section detail on sheet 3 of the development plan that includes design treatment and height dimensions for all masonry screen walls. [Rezoning Condition no. 7]

The Arizona Department of Transportation (ADOT) has initiated a Houghton Road Corridor Study to determine future improvements to Houghton Road from Sahuarita Road to Tanque Verde Road. ADOT has not yet made specific recommendations, but they have publicly stated that the future roadway will have limited access. The term, limited access, has been defined to limit access onto Houghton Road to major streets only. The two driveways along Houghton Road proposed in this development plan clearly do not represent limited access.

Since Houghton Road is a State Route for planning purposes, the design of the access onto Houghton Road should be reviewed and/or approved by ADOT before the revised development plan is approved by the City. Their review will also be required for any modifications to the median on Houghton Road.

As a limited access facility it can be expected that direct access from individual driveways will be extremely limited. This may mean that any access granted currently will be eliminated in the future. In consideration of this fact, the revised development plan, including on-site circulation, should be designed in a manner that provides all access and f circulation from Broadway Boulevard.

15. The Development Plan and updated Landscape Plan must delineate the approved Houghton Road cross-sections, including the urban trails system along the west side of the right-of-way. Please coordinate with Traffic Engineering, Vince Catalano, and Parks and Recreation, Glenn Hicks, and provide a section detail that shows the landscape cross-section, including urban trail system along Houghton Road.