Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - DEV PLAN
Permit Number - D00-0057
Review Name: RESUBMITTAL - CDRC - DEV PLAN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/15/2005 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
06/17/2005 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: D00-057 TOTAL TOOL/REVISED DEVELOPMENT PLAN DATE: June 17, 2005 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. APPROVED WITH THE FOLLOWING CONDITION: CORRECT FAIRVIEW ST TO FAIRVIEW AV. (LOCATION MAP) ON MYLAR. NOTE: 1: Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2: All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. jg |
06/21/2005 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) Based on the expansion of floor area the requirements of LUC 3.7 apply to the entire site. LUC 3.7.1.2.B.2.b 2) Provide a street landscape border along Grant Road. LUC 3.7.2.4.A |
06/21/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
06/24/2005 | JCLARK3 | ENV SVCS | REVIEW | Approved | |
06/27/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Center Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: David Rivera Principal Planner PROJECT: D00-037 Total Tool Grant Road Development Plan Revision TRANSMITTAL: June 27, 2005 DUE DATE: June 29, 2005 1. Revise the math in the parking calculation to reflect the actual gross floor area including the proposed expansion. Based on the drawing the calculation should read 8,064 S.F ¸ 500 S.F. = 16 parking spaces required and provided. 2. The new proposed location of the 12' x 55' loading zone does not allow trucks to maneuver into and out of the space. Revise location of loading zone. 3. Between any PAAL and building a 5-foot pedestrian refuge, including a 4-foot sidewalk must be maintained. With the new proposed location of the single parking space adjacent to the loading zone, the access drive to this space is considered a PAAL. The pedestrian refuge area must be physically separated from the PAAL by means of concrete curbing, barriers, railings, bollards or other means. Revise plan to show the pedestrian refuge and sidewalk along the west side of the building. DS 3-05.2.2.B.1 DS 2-08.4.1 If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. RESUBMITTAL OF THE FOLLOWING ITEMS IS REQUIRED: revised development plan. |
06/28/2005 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: TOTAL TOOL, INC. D00-0057 Tucson Electric Power Company has reviewed and approved the development plan submitted for review June 16, 2005. Please call me at (520) 917-8745, should you have any questions. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com <mailto:lcastillo@tep.com> |
07/01/2005 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Denied | June 27, 2005 TO: Rob Caylor Robert Caylor Construction Co. THRU: Patricia Gehlen City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Total Tool, Inc. Development Plan – 2nd Submittal D00-0057 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. Add the following two General Notes THE LANDSCAPING WITHIN ALL PUBLIC SEWER EASEMENTS SHOWN HEREON SHALL BE IN ACCORDANCE WITH THE PLANTING GUIDELINES OF PC/COT STANDARD DETAIL WWM A-4. NO PERMANENT STRUCTURES (I.E., MASONRY WALLS, FENCES, ETC.) MAY BE CONSTRUCTED ON OR THROUGH THE PUBLIC SEWER EASEMENTS SHOWN HEREON WITHOUT SEPARATE WRITTEN CONSENT OF THE PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT. There is a label indicating a 33-foot RCP sewer within a sewer easement. Show the sewer easement boundaries and clearly point them out. Additionally, revise the diameter of the 33-foot RCP sewer to reflect the proper material and pipe diameter. A 10-foot wide sewer easement is shown point only to one of the two boundaries. Please revise your layout and clearly show the easement limits and its proper location. Parking is being proposed on top of an existing public manhole. Delete all parking spaces within a 12-foot radius of existing manhole 9911-03A. We will require a revised set of drawings and a response letter addressing each comment. Additional comments may be made during the review of these documents. The next submittal of this project will be the 3rd submittal. A check for the review fee of this submittal in the amount of $39.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter. For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
07/09/2005 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES July 9, 2005 Rob Caylor Robert Caylor Construction Company 6711 East Camino Principal Tucson, AZ 85715 Subject: D00-0057 Total Tool, Inc. Development Plan Dear Rob: Your submittal of June 16, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter for each agency explaining how each outstanding requirement has been addressed: ALL BLUELINES MUST BE FOLDED 4 Copies Revised Development Plan (waste water, zoning, landscaping, DSD) 3 Copies Revised Landscape Plan (zoning, landscaping, DSD) Should you have any questions, please call me at 791-5608, ext. 1179. Sincerely, Patricia Y. Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 290-6014 |