Tesla is proposing to install their Supercharging station within an existing parking lot. The project includes the installation of (3) charging cabinets, (12) charging posts, (1) switchgear assembly, (1) transformer and (1) meter and (1) wireless access point.
REV1: On Sheets C-111 and E-101, switchgear and utility transformer have swapped locations to improve access and streamline service. - Charger foundations have been updated with revised details on Sheets C-201 and C-203 - Emergency stop button has been added to the site, see site plan on Sheets C-111 and E-101. Wiring has been added to Sheet E-201 and detail has been added to Sheet E-301.