Description:
THIS PROJECT WILL BE COMPRISED OF:CHANGES ON THE EXISTING TOWER TYPE: TOWER TYPE:
· POSITION (1) - RELOCATE (2) EXISTING RRH
UNITS PER SECTOR TO STANDOFF ON NEW BACK
TO BACK MOUNT AND
WIRE TO POSITION 1, (3) SECTORS, (6) TOTAL
· POSITION (3) -
REMOVE (1) EXISTING AT&T ANTENNA PER SECTOR, (3) SECTORS,
(3) TOTAL
· POSITION (3) - REMOVE (1) EXISTING AT&T TMA PER
SECTOR, (3) SECTORS, (3) TOTAL
· POSITION (3) - RELOCATE
(1) EXISTING AT&T RRH UNIT TO EXISTING STANDOFF AND WIRE
TO
POSITION (1) PER SECTOR, (3) SECTORS, (3) TOTAL
· POSITION
(3) - RELOCATE (1) EXISTING AT&T WCS FILTER (BETA SECTOR
ONLY)
· POSITION (3) - INSTALL (2) NEW AT&T ANTENNAS WITH
INTEGRATED RRH UNIT PER SECTOR,
(3) SECTORS, (6) TOTAL
·
REMOVE (18) EXISTING COAX CABLES
· REMOVE (1) EXISTING DC6
SURGE SUPPRESSOR
· INSTALL (1) NEW DC9 SURGE SUPPRESSOR
·
INSTALL (1) NEW 24 PAIR FIBER TRUNK
· INSTALL (1) NEW 6AWG
DC TRUNK