Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER DESIGN PLAN REVIEW v.1
Plan Number - TW-WCP-0824-00054
Review Name: WATER DESIGN PLAN REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TFD Review & Signature | PENDING ASSIGNMENT | ||||
TW Design Plan Review | PENDING ASSIGNMENT | ||||
TW Issue Invoice | PENDING ASSIGNMENT | ||||
TW Managerial Review | PENDING ASSIGNMENT | ||||
TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
TW Administrative Completeness | REQUIRES RESUBMIT | The water plan is incomplete because it does not conform to Tucson Water's current drafting standards. Please resubmit your plan in accordance to the Design Standards Illustrations 2023 (DSI). Which can be found here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf The incorrect cover sheet and border was used on the plan set. The correct construction notes were missing from the plan set. The Plan and profile are not aligned properly and the all line styles and symbols are is incorrect throughout. Plan alignment is not properly tied down to existing monumentation and control line information is missing from the new water alignment. |