Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER CONSTRUCTION PLAN REVIEW v.1
Plan Number - TW-WCP-0624-00048
Review Name: WATER CONSTRUCTION PLAN REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TFD Review & Signature | PENDING ASSIGNMENT | ||||
TW Design Plan Review | PENDING ASSIGNMENT | ||||
TW Hydraulic Modeling Review | PENDING ASSIGNMENT | ||||
TW Issue Invoice | PENDING ASSIGNMENT | ||||
TW Managerial Review | PENDING ASSIGNMENT | ||||
TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
TW Administrative Completeness | REQUIRES RESUBMIT | Incorrect First Design Checklist was submitted. Please complete the latest Checklist found at the following location: https://www.tucsonaz.gov/files/sharedassets/public/v/2/city-services/tucson-water/documents/first_design_checklist.pdf No Master Plan was submitted. Do not submit the Master Plan for the Canceled project. No Design Plan was submitted. Do not Submit the Plan for the recently canceled project. Please note: The submitted plan does not conform to the Design Standards Illustrations 2023 (DSI) please submit a plan that conforms to the New Drafting Standards. The Design Standards Illustrations can be found at the following location: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf |
|||
TFD MWP Initial Review | REVIEW COMPLETED | Previously approved by JPD |