Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER CONSTRUCTION PLAN REVIEW v.2
Plan Number - TW-WCP-0624-00048
Review Name: WATER CONSTRUCTION PLAN REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TFD Review & Signature | PENDING ASSIGNMENT | ||||
TW Design Plan Review | PENDING ASSIGNMENT | ||||
TW Hydraulic Modeling Review | PENDING ASSIGNMENT | ||||
TW Issue Invoice | PENDING ASSIGNMENT | ||||
TW Managerial Review | PENDING ASSIGNMENT | ||||
TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
TW Administrative Completeness | REQUIRES RESUBMIT | The submitted plan does not conform to the Design Standards Illustrations 2023 (DSI) please submit a plan that conforms to the New Drafting Standards. The Design Standards Illustrations can be found at the following location: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf Plan and Profile and keynote callouts are now require for the next submittal. This is the second Request. Do Not Resubmit a plan that does not conform to the current drafting standards. |
|||
TFD MWP Initial Review | REVIEW COMPLETED |