Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER DESIGN PLAN REVIEW v.1
Plan Number - TW-WCP-0524-00038
Review Name: WATER DESIGN PLAN REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TFD Review & Signature Fast | PENDING ASSIGNMENT | ||||
| TW Design Plan Review | PENDING ASSIGNMENT | ||||
| TW Issue Invoice | PENDING ASSIGNMENT | ||||
| TW Managerial Review | PENDING ASSIGNMENT | ||||
| TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
| TW Administrative Completeness | REQUIRES RESUBMIT | All water construction plans submitted to New Area Development after March 1, 2024 shall conform to the requirements of the Design Standards Illustrations 2023 (DSI). The submitted plans do not conform to this requirement and will require a resubmittal. The Checklist submitted is outdated. Please complete the First Design Checklist with the effective date of March 1, 2024. The DSI requirements can be found at the following location: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf The updated checklist can be found at the following location: https://www.tucsonaz.gov/files/sharedassets/public/v/2/city-services/tucson-water/documents/first_design_checklist.pdf |