Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER DESIGN PLAN REVIEW v.2
Plan Number - TW-WCP-0424-00024
Review Name: WATER DESIGN PLAN REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TFD Review & Signature | PENDING ASSIGNMENT | ||||
TW Design Plan Review | PENDING ASSIGNMENT | ||||
TW Issue Invoice | PENDING ASSIGNMENT | ||||
TW Managerial Review | PENDING ASSIGNMENT | ||||
TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
TW Administrative Completeness | REQUIRES RESUBMIT | Design Plans do not conform to Design Standards Illustrations 2023 (DSI) please review the Latest DSI standards and resubmit: https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf Project does not conform to the requirements of Item 11 of the First Design Checklist. Adjacent properties are not clearly identified including the subject parcel. Project does not conform to the requirements of Item 15 of the First Design Checklist. The existing Easements are not properly labeled. Project does not conform to the requirements of Item 21 of the First Design Checklist. Project does not conform to the requirements of Item 22 of the First Design Checklist. Project does not conform to the requirements of Item 37 of the First Design Checklist. (Zone 'A') Project does not conform to the requirements of Item 38 of the First Design Checklist. Callouts on plan do not conform to the DSI standards. Easement for the 10 foot by 25 foot large meter assembly is not properly shown on the plan. Wrong Tucson Water Border was used for sheets 2 and 3. The signature block on sheet 1 is shown twice. Profile for proposed service line is not permitted. Symbols and line styles used on the plan do not conform to the current DSI standards. 3-inch service lines are not permitted. The minimum service line used for a 3- inch meter is 4-inches. What will happen to the existing Meter that serves the project? Only one meter per premise is permitted. It is assumed that the existing meter is being replaced with the proposed 3 inch meter. Please address the existing meter on the plan so the customer may get a credit that can be applied to the new meter. For additional information please refer to the Instructions for the First Design Checklist located here: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/tucson-water/cde/instructions_for_checklist-first_design-march_2024.pdf |