Plan Review Detail
Review Status: Approved
Review Details: TWPE 90% DESIGN REVIEW v.1
Plan Number - TW-PLAN-0426-0091
Review Name: TWPE 90% DESIGN REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TWPE System Planning | APPROVED | New proposed 8-inch main in Church Ave matches SP hydraulic analysis recommendation. | |||
| TWPE Engineering Manager - Authorization | REVIEW COMPLETED | Consultant needs to show limits of temporary trench pavement patch and notes on abandoned 30" storm drain removal. Need final opinion of probable construction cost for water system modifications. |