Plan Review Detail
Review Status: Requires Resubmit
Review Details: TWPE AS-BUILT REVIEW v.1
Plan Number - TW-PLAN-0426-0077
Review Name: TWPE AS-BUILT REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TWPE Civil Engineers (CE) | NOT REQUIRED | ||||
| TWPE Engineering Chief - Authorization | REQUIRES RESUBMIT | TW-PLAN-0426-0077 1) The “as-built” plans are missing the inspectors block and Deputy Director and Chief Engineer Signatures. Plans were signed on 03/04/2026. Those are the plans that need to be as-built. As-built the approved set of plans and have the inspectors block added. |
|||
| TWPE Engineering Manager Oversight | REQUIRES RESUBMIT | PRV Data on Sheet 6 should be filled in by inspector or as-built engineer. What are the PRV Settings? One setting shown on cover, are both PRVs in operation? Any normally closed valves? Dates in title block are wrong, every sheet. |
|||
| TWPE Project Managers | REVIEW COMPLETED |