Plan Review Detail
Review Status: Approved
Review Details: TWPE 60% DESIGN REVIEW v.1
Plan Number - TW-PLAN-0426-0074
Review Name: TWPE 60% DESIGN REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TWPE System Planning | APPROVED | ||||
| TWPE Construction | NOT REQUIRED | ||||
| TWPE Maintenance | NOT REQUIRED | ||||
| TWPE Project Supervisor Oversight | NOT REQUIRED | ||||
| Fire New Construction Standard | REVIEW COMPLETED | ||||
| ROW Engineering Review Standard | REVIEW COMPLETED | DTM Comment File has been added to attachments. Floodplain Use Permit will be required for working in the FEMA Floodplain (Wilson Avenue Wash) Apply under subrecords. DTM has projects on Blacklidge and Glenn St, coordination with DTM project manager will be required. DTM Utility Abandonment waiver approval will be required for utilities abandoned in the ROW. See COT Public Utility Adminstrative Manual for more information. |
|||
| TWPE Engineering Manager - Authorization | REVIEW COMPLETED | ||||
| TWPE GSI Green Stormwater Infrastructure | REVIEW COMPLETED | Approved - no conflicts with S2S project areas / no comments | |||
| TWPE Public Information Planning | REVIEW COMPLETED | I sent PIO everything by mail. They are working on Public meeting and mailing. | |||
| TWPE Survey | REVIEW COMPLETED |