Plan Review Detail
Review Status: Requires Resubmit
Review Details: TWPE 60% DESIGN REVIEW v.1
Plan Number - TW-PLAN-0326-0050
Review Name: TWPE 60% DESIGN REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TWPE Security | APPROVED | ||||
| TWPE System Planning | APPROVED | From Kat (copied from email sent to Tariq): I took a look and the only question I had was on your redline callout 14. I don’t think that should be there. As for sizing, or minor losses from existing and proposed valves and bends. We don’t have a pump curve or elevations to evaluate. If it was working before and you’re not changing the pump, and you’re keeping similar fittings (size, type, quantity) then it should be fine. We can’t give you a memo since we don’t have data to evaluate, but I do appreciate getting the chance to look at it. I don’t see an red flags that warrant a hydraulic review of this recirc system. This assumes the existing system was working effectively and any upgrades are just replacing deteriorated parts. |
|||
| TWPE Civil Engineers (CE) | REVIEW COMPLETED | ||||
| TWPE Instrumentation | VOID |