Plan Review Detail
Review Status: Approved
Review Details: TWPE 90% DESIGN REVIEW v.1
Plan Number - TW-PLAN-0326-0026
Review Name: TWPE 90% DESIGN REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TWPE Cathodic Protection | APPROVED | ||||
| TWPE Senior Engineering Associates (SEA) | APPROVED | ||||
| TWPE System Planning | APPROVED | 10-inch main is being upsized to 12-inch along Alameda St from Manning House Way to 6th Ave. This is in effort to improve fire flow in the area. System Planning has approved. | |||
| TWPE Civil Engineers (CE) | REVIEW COMPLETED | Plans for Alameda Street Water Modifications still need Corrosion Protection Plans for new 16- and 12-inch waterlines relative to the existing 8-inch steel high pressure natural gas pipeline. Plans for Alameda waterline need the limits of temporary pavement patch delineated. Final construction Cost Opinions are needed for both Alameda and Church Water Modifications. | |||
| TWPE Engineering Manager - Authorization | REVIEW COMPLETED | Plans for Alameda Street Water Modifications still need Corrosion Protection Plans for new 16- and 12-inch waterlines relative to the existing 8-inch steel high pressure natural gas pipeline. Plans for Alameda waterline need the limits of temporary pavement patch delineated. Final construction Cost Opinions are needed for both Alameda and Church Water Modifications. | |||
| TWPE Engineering Manager Oversight | REVIEW COMPLETED | Plans for Alameda Street Water Modifications still need Corrosion Protection Plans for new 16- and 12-inch waterlines relative to the existing 8-inch steel high pressure natural gas pipeline. Plans for Alameda waterline need the limits of temporary pavement patch delineated. Final construction Cost Opinions are needed for both Alameda and Church Water Modifications. |