Plan Review Detail
Review Status: In Review
Review Details: TWPE 90% DESIGN REVIEW v.1
Plan Number - TW-PLAN-0326-0022
Review Name: TWPE 90% DESIGN REVIEW v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TWPE Project Managers | IN REVIEW | ||||
| TWPE Civil Engineers (CE) | PENDING ASSIGNMENT | ||||
| TWPE Engineering Manager - Authorization | PENDING ASSIGNMENT | ||||
| TWPE Senior Engineering Associates (SEA) | PENDING ASSIGNMENT | ||||
| TWPE System Planning | REVIEW COMPLETED | Model results indicate the project meets TW Standards for pressure and velocity requirements. Pipe velocities are currently under 1 fps (Figure 2) during normal operating conditions and under 2 fps during fire flow conditions (Figure 3). Pressures range from 64 psi – 83 psi under normal operating conditions and 58 psi – 83 psi during fire flow conditions. Note: Node pressures along Grant Road exceed 80 psi. Currently, there are no plans to relocate meters or work on private plumbing. Based on TW Standards, TW is not planning to provide private PRV’s to customers. |