Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TW-MWP-1024-00060
Parcel: 140398760

Review Status: Requires Resubmit

Review Details: WATER MASTER PLAN - SINGLE PHASE v.2

Plan Number - TW-MWP-1024-00060
Review Name: WATER MASTER PLAN - SINGLE PHASE v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
TW Hydraulic Modeling Review PENDING ASSIGNMENT
TW Issue Invoice PENDING ASSIGNMENT
TW Managerial Review PENDING ASSIGNMENT
TW Verify Fees Paid PENDING ASSIGNMENT
TW Administrative Completeness REQUIRES RESUBMIT The water master plan is incomplete. Proposed spot grade elevations at all tie in points, tees, crosses, hydrants, dva and all commercial and irrigation services are missing from the plan.
The checklist indicates there are domestic services which are missing on the plan.
Commercial services are missing on the plan.
Irrigation services are missing on the plan.
Fire services are not clearly identified and are not properly depicted on the plan.
All fire hydrants shall be 8-inch fire hydrants.
Incorrect construction notes were included on the plan. Please include General construction notes 1 through 12 found on the Design Standards illustrations 2023:

https://www.tucsonaz.gov/files/sharedassets/public/v/1/water/documents/new-area-development/design-standards-illustrations-2023-dsi.pdf

Proposed easements are not shown on the plan.

The entire development is a "lollipop" dead end and will require 2 connections to the existing infrastructure. Please provide justification as to why looping the project is not feasible. Otherwise make at least one more connection to the proper pressure zone.
Existing water infrastructure plan number and pressure zone is not shown on the plan.

Incorrect North arrow is used.

Most items missing on the Master Plan were requested on the Master Plan checklist. Please review the checklist and use it as a tool to verify all the necessary requirements have been met.
TFD MWP Initial Review REVIEW COMPLETED