Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: WATER MASTER PLAN - SINGLE PHASE v.1
Plan Number - TW-MWP-0824-00044
Review Name: WATER MASTER PLAN - SINGLE PHASE v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TW Hydraulic Modeling Review | PENDING ASSIGNMENT | ||||
TW Issue Invoice | PENDING ASSIGNMENT | ||||
TW Managerial Review | PENDING ASSIGNMENT | ||||
TW Verify Fees Paid | PENDING ASSIGNMENT | ||||
TW Administrative Completeness | REQUIRES RESUBMIT | It appears that this is a part of a multiphase project. You will be required to submit an Overall Master Plan prior to submitting this Phase and all other phases of this project. For this Phase: The Master Plan Checklist was not completed . Page 1 and 2 must be filled out completely. The fire flow and duration is missing from General Construction note 4. Fire flow duration is missing from the plan. Fire and Domestic shall be served through a single pipeline. Parallel public mains are not permitted. Wrong Line types and symbols were used throughout the plan. 8-inch Fire hydrants are required for commercial and for Fire flows greater than 1000 gpm. |
|||
TFD MWP Initial Review Fast | REVIEW COMPLETED |