Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-1225-02213
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/05/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Review TCP and Design plan Scope of work. 1) Work appears to be North of Broadway Blvd in bus pullout. Is work crossing the intersection ? 2) Is PPC - Point control being used on Turn bays at intersection? 3) Pre-Warning show a BE PREPARED TO STOP. Where is traffic being stopped. 4)Address Bus access to as pole is located near stop 5) Would Standard Right Lane closure provide safer work conditions and access.. Shadow trucks are acceptable as long as work is not stating for more than 60 mins |
||
| 12/31/2025 | Transportation Application Review Express | REVIEW COMPLETED |