Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-1023-02759
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/30/2023 | ROW Engineering Review | REQUIRES RESUBMIT | TR-UTL-1023-02759 (4126 S 14TH AV TUCSON, AZ 85714) Please resubmit revised drawings along with a detailed response letter which states how all comments were addressed. 1. PUAM - Section 9 – Please use the Submittal Requirement for Utility Work to prepare a site plan and construction plan for this project. https://www.tucsonaz.gov/files/sharedassets/public/dtm/documents/linked-documents/city-of-tucson-public-utility-administrative-manual_20230504.pdf Faffs Riederer Faffs.Riederer@tucsonaz.gov Abbreviations: City of Tucson Code (COTC), Unified Development Code (UDC) Administrative Manual (AM), Technical Standards Manual (TSM), Street Design Guide (SDG), Pima Association of Governments Standard Details (P. A. G. SD), Access Management Guidelines (AMG), Major Streets and Routes Plan (MS&R), City of Tucson Public Utility Administrative Manual (PUAM). |
||
| 10/25/2023 | Transportation Application Review | REVIEW COMPLETED | Relocation of existing gas line |