Permit Number: TR-UTL-0926-01572
Parcel: 133555630

Review Status: Requires Resubmit

Review Details: RIGHT-OF-WAY REVIEW v.3

Permit Number - TR-UTL-0926-01572
Review Name: RIGHT-OF-WAY REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/28/2026 Transportation Application Review Express PENDING ASSIGNMENT
09/30/2026 ROW Engineering Review - Standard REQUIRES RESUBMIT DTM Review Comments:
1) New TCP has areas that require additions review by TCP company to ensure sign sequences match work, Conformation of ROW impact based on Scope of work. (Review provided Aerial Site plan that show work truck and equipment placement for reference). Note that Pedestrian access is still considered impacted with work is being performed over sidewalk or equipment is crossing sidewalk.
2) Have place both TCPs on Resubmittal status - Review and confirm is One TCP will cover full project needs or if there will be 1 TCP for Physical Crossing and Second/Third required to address post crossing work and Impact based on proposed scope of work.
3) Review and confirm with contractor work impact area, Truck and equipment staging and parking. Review Pedestrian Impact during overhead and ground work.
4) Field Requirement - Work Hours - 9 am - 2:30 pm Work within or Near School Should not conflict with School Access or Bus Access, During School operating hours.