Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-0923-02580
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/04/2023 | Real Estate | REQUIRES RESUBMIT | This plan should be revised to ensure the entrance side of the Toole Lot will remain open to allow adequate vehicle ingress. | ||
10/03/2023 | ROW Engineering Review | REQUIRES RESUBMIT | Construction Plan Show utility easement on Private Property (COT Real Estate) Traffic Control Plan Blocking access to parking lot, will "Exit" be used for entrance? Show existing driveway Additional information required Is proposed manhole in optimal location? Access to manhole will close off entrance whenever maintenance is needed. Recommend to relocate from driveway/parking area access lane (PAAL). Please submit a comment response letter on next submittal. |
||
09/28/2023 | MITZ District | REVIEW COMPLETED | |||
09/26/2023 | Transportation Application Review | REVIEW COMPLETED |