Permit Number: TR-UTL-0726-01237
Parcel: 11504472A

Review Status: Requires Resubmit

Review Details: RIGHT-OF-WAY REVIEW v.1

Permit Number - TR-UTL-0726-01237
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/30/2026 ROW Engineering Review - Standard REQUIRES RESUBMIT DTM Review Comments:
1) Provided Construction plan in addition to the submitted Aerial Plan
2) Review TCP Redline Comments, Not below call out items for Traffic Control plan, with respect to Updated Review and Fees Process. .
Construction / Design Plans / Site Plan:
When pavement cuts are proposed, identify the total square yardage of each pavement cuts in the Work Detail section of the permit application and on the applicable design, site, or construction plans, and call out the location of Bore Pits (with dimension) , Trenches, and Aerial work.
Traffic Control Plan (TCP):
The TCP shall include:
o Total number of Active ROW impact workdays for each Closure and Closure Type when multiple closure will be used within the project.
o Total closure length, including:
 Taper length
 Buffer space length
 Work area length
 Return taper length
 Bike Lane closure length if different than overall TC closure
 Pedestrian Detour Route – if different than overall TC closure
 Plan to call out all Bus Stops and how they are address with in TC closure
o Work hours based on the applicable ROW closure type.
o All other required traffic control details and work area information necessary to clearly define the proposed impacts.
o Plans should note or take into consideration type of work and associate Equipment that will be placed (Ex. Bore line at back of Sidewalk will require Bore Drill placement on Sidewalk, work trucks park in ROW when work maybe behind curb line, or Aerial Bucket trucks placement).
Note: This information shall be included with all permit applications moving forward to comply with the City's updated review process and current Permit Fee Schedule.
07/29/2026 Transportation Application Review Express REVIEW COMPLETED