Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-0726-01206
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/23/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Review - Call out Street Parking impact Call out and Address Sidewalk impact - and Access Call out Work Hours and Day of Active work on TCP Call out and Show Alley with in Work area. Standard Comments – Recent Review Process Updates The following information is required for all permits submitted under the updated City review process: 1. Permit Application: Include the total number of Active ROW (Right-of-Way) impact days for each closure type and location (e.g., right lane, left lane, bike lane, sidewalk, turn bay, etc.). 2. Permit Application / Design Plans: When pavement cuts are proposed, identify the total square yardage of pavement cuts in the Work Detail section of the permit application and on the applicable design, site, or construction plans. 3. Traffic Control Plan (TCP): The TCP shall include: o Total number of Active ROW impact work days. o Total closure length, including: Taper length Buffer space length Work area length Return taper length Bike Lane closure length if different than overall TC closure Pedestrian Detour Route – if different than overall TC closure Plan to call out all Bus Stops and how they are address with in TC closure o Approved work hours based on the applicable ROW closure type. o All other required traffic control details and work area information necessary to clearly define the proposed impacts. Note: This information shall be included with all permit applications moving forward to comply with the City's updated review process and current Permit Fee Schedule. |
||
| 07/22/2026 | Transportation Application Review Express | REVIEW COMPLETED |