Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-0424-00834
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/24/2024 | ROW Engineering Review | REQUIRES RESUBMIT | Construction Plan N 15th St is under pavement moratorium. The depth of the mill and pavement replacement shall be 2-inches thick and 25-ft in both directions from the edge of the pavement patch. Revise plan to show 2" mill and fill vs 25' seal coat shown. If possible, consider other method of installation or alternate route. |
||
04/19/2024 | Transportation Application Review | REVIEW COMPLETED |