Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-UTL-0226-00217
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/05/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Review Traffic Control Comments and Redline Notes. Note Proposed setups fall within active City of Tucson Project area. Redline files located under Attchments. Refer to Email sent to Trejo, Angeline , Delgado, Yadira , AZOutstatePermits on 3/3/2026, |
||
| 03/03/2026 | Engineering Project Managers - Standard | REVIEW COMPLETED | On Behalf of Robert Lane per email. Grant Road is now a 6-lane facility at both Palo Verde and Dodge. Westbound traffic currently travels next to the north curb line. Any blockage of that lane will require modification of the existing traffic pattern; there are no other lanes currently being used. The traffic control for Grant Road 3-4 begins about 100-200 feet west of Edith (about as shown in Google Street View, March 2025). Also, the bus stops are all temporary and may not be at the same location as the plans relate. Coordinate Traffic Control with Granite, if they’re going need the lane next to the curb. At this time permit not able to be approved as submitted. Thank you, Rob Lane, PE, PTOE Project Manager Senior Engineering Associate Department of Transportation & Mobility | City of Tucson rob.lane@tucsonaz.gov |
||
| 02/05/2026 | Transportation Application Review Express | REVIEW COMPLETED |