Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.3
Permit Number - TR-UTL-0224-00211
Review Name: RIGHT-OF-WAY REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/18/2024 | Historic | PENDING ASSIGNMENT | |||
| 07/18/2024 | Transportation Application Review | PENDING ASSIGNMENT | |||
| 08/15/2024 | ROW Engineering Review | REQUIRES RESUBMIT | Revise design and drainage statement to show utility crossing Santa Cruz without attaching to Bridge. Drainage Report will need to be revised for Scour Analysis for new utility line crossing SANTA CRUZ RIVER. |