Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0926-01007
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/21/2026 | MITZ District - Standard | PENDING ASSIGNMENT | |||
| 09/21/2026 | ROW Engineering Review - Standard | PENDING ASSIGNMENT | |||
| 09/21/2026 | Transportation Application Review Express | REQUIRES RESUBMIT | The description provided is unclear. Please provide additional details specifying the exact work being performed and clarify what type of tie-in is being proposed. Please note that for Right-of-Way permits, each type of work requires a separate permit. For example, sidewalk repair /new sidewalk installation would require a separate Right-of-Way permit from gas work. Similarly, sewer and water work within the Right-of-Way must each be submitted under their appropriate separate permit. Please revise the description to clearly identify the scope of work and submit separate permits for each applicable type of Right-of-Way work. |