Permit Review Detail
Review Status: Approved
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0826-00933
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/10/2026 | ROW Engineering Review - Standard | APPROVED | -Shall coordinate work with Mansfield Middle School at least 48hrs prior to setup. -Work is proposed within a school zone and includes trenching activities. Contractor shall coordinate construction activities and traffic control with the school and applicable agencies. Maintain safe and continuous pedestrian access at all times, including access to sidewalks, crosswalks, and school entrances. Open trenches shall be properly protected and secured in accordance with applicable standards. Schedule work, lane/sidewalk closures, and construction vehicle movements to minimize conflicts with school arrival and dismissal periods. Provide appropriate temporary traffic and pedestrian control measures for review and approval prior to construction |
||
| 09/04/2026 | MITZ District - Standard | REVIEW COMPLETED | Proposed Scope of Work is located in proximity to Mansfeld Middle School. Coordination with School Administration is required prior to the Pre-Activity Meeting with Inspections. Closures and work activities shall not be in place during, or impact, school drop-off or pick-up times. | ||
| 08/31/2026 | Transportation Application Review Express | REVIEW COMPLETED |